Summary

PRFS201910311
Fire Suppression System
Finaled
CITY OF BLOOMINGTON
Alteration/Repair/Replace
Install wet sprinkler system in new Bloomington Fire Station to provide complete sprinkler coverage. Install manual dry standpipe in new hose/training tower marked "FOR TRAINING PURPOSES ONLY"
09/04/2019
09/06/2019
12/27/2020
06/30/2020

Locations

Permits

Permit Number: PRFS201910311

Fire Suppression System
Finaled
09/06/2019
12/27/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rough-in Inspection Partial Pass 1/16/2020 (8:00 - 10:00) 1/16/2020 (AM) 01/16/2020
Corrections:


Miscellaneous/Other
Comment Only
01/16/2020
Partial rough in approved for bulk pipe 1st floor office and training room areas. Still need to inspect flex drops once attached to ACT grid or other ceilings.

Fire Rough-in Inspection Partial Pass 2/20/2020 (12:30 - 2:30) 2/20/2020 (PM) 02/21/2020
Corrections:


Miscellaneous/Other
Comment Only
02/21/2020
Rough in approved for hard lid kitchen and dayroom area.

Hydro Test Start Passed 6/30/2020 (12:30 - 2:30) 6/30/2020 (PM) 06/30/2020
Contractor had to cancel inspections for 5/19/2020 as genral contractor poured concrete....near main drain. jsmidt 05/18/2020 9:27 AM
Hydro Test End Passed 6/30/2020 (2:30 - 3:30) 6/30/2020 (PM) 06/30/2020
Fire Inspection Final Passed 6/30/2020 (12:30 - 2:30) 6/30/2020 (PM) 06/30/2020
Contractor had to cancel inspections for 5/19/2020 as genral contractor poured concrete....near main drain. jsmidt 05/18/2020 9:27 AM