PRFS202003903
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Rough-in Inspection | Partial Pass | 6/2/2020 (10:00 - 12:00) | 6/2/2020 (AM) | 06/03/2020 |
|
Corrections:
Miscellaneous/Other
Carried Forward
06/03/2020
Add head in corridor near 1142. Ensure that there is a barrier near open ceiling to avoid adding coverage above dropped ceiling.
|
||||
| Fire Rough-in Inspection | Passed w/ Conditions | 08/04/2020 | ||
|
Corrections:
Miscellaneous/Other
Resolved
08/04/2020
Add head in corridor near 1142. Ensure that there is a barrier near open ceiling to avoid adding coverage above dropped ceiling.
|
||||
|
Miscellaneous/Other
Outstanding
08/04/2020
Add surge clips
|
||||
| Fire Inspection Final | Passed | 08/24/2020 | ||