PRFS202004246
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Rough-in Inspection | Passed | 11/25/2020 (10:00 - 12:00) | 11/25/2020 (AM) | 11/25/2020 |
| Hydro Test Start | Passed | 12/30/2020 (8:00 - 10:00) | 12/30/2020 (AM) | 12/30/2020 |
| Hydro Test End | Passed | 12/30/2020 (10:00 - 12:00) | 12/30/2020 (AM) | 12/30/2020 |
| Fire Inspection Final | Partial Pass | 2/3/2021 (7:00 - 8:00) | 2/3/2021 (AM) | 02/03/2021 |
|
Corrections:
Miscellaneous/Other
Outstanding
02/03/2021
Partial Final Inspection of water flow alarms and valves approved. However need to perform the following prior to final/close out of permit:
1. Remove all tape/foil covering heads in the black ceiling areas. Found several covered heads. Further inspection of area needed to ensure no heads are painted as well.
2. Add sprinkler heads under large duct work on 2nd floor. Locations discussed with sprinkler fitter and job supervisor.
|
||||
| Fire Inspection Final | Passed | 2/10/2021 | 02/10/2021 | |
|
Corrections:
Miscellaneous/Other
Outstanding
02/03/2021
Partial Final Inspection of water flow alarms and valves approved. However need to perform the following prior to final/close out of permit:
1. Remove all tape/foil covering heads in the black ceiling areas. Found several covered heads. Further inspection of area needed to ensure no heads are painted as well.
2. Add sprinkler heads under large duct work on 2nd floor. Locations discussed with sprinkler fitter and job supervisor.
|
||||