PRFS202100470
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Hydro Test Start | Passed | 3/1/2021 (10:00 - 12:00) | 3/1/2021 (AM) | 03/01/2021 |
Hydro Test End | Passed w/ Conditions | 3/1/2021 (10:00 - 12:00) | 3/1/2021 (AM) | 03/01/2021 |
Fire Inspection Final | Failed | 3/1/2021 (10:00 - 12:00) | 3/1/2021 (PM) | 03/01/2021 |
Corrections:
Miscellaneous/Other
Carried Forward
03/01/2021
Hydro test approved today. However final inspection not approved. Need to perform rough in inspect to ensure system installed per design and code. If installation deviated from original design than engineer on record shall approve and resubmit. Fire alarm contractor shall be on site for final inspection to test flow and tamper switches.
|
||||
Fire Inspection Final | Passed | 3/8/2021 (8:00 - 10:00) | 3/8/2021 (AM) | 03/08/2021 |
Corrections:
Miscellaneous/Other
Outstanding
03/01/2021
Hydro test approved today. However final inspection not approved. Need to perform rough in inspect to ensure system installed per design and code. If installation deviated from original design than engineer on record shall approve and resubmit. Fire alarm contractor shall be on site for final inspection to test flow and tamper switches.
|
||||
Fire Rough-in Inspection | Passed w/ Conditions | 3/8/2021 (8:00 - 10:00) | 03/08/2021 |