Summary

PRFS202106966
Fire Suppression System
Finaled
KTJ 348 LLC
Other
Installation of new wet sprinkler system
06/07/2021
06/25/2021
04/30/2022
11/01/2021

Locations

Permits

Permit Number: PRFS202106966

Fire Suppression System
Finaled

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rough-in Inspection Partial Pass 7/21/2021 (10:00 - 12:00) 7/21/2021 (AM) 07/21/2021
Miscellaneous/Other
Comment Only
07/21/2021
Partial Rough In. Approved for bulk pipe. Need to inspection flex drops once ceiling grid is installed and prior to covering with tile or board.

Hydro Test Start Passed 11/1/2021 (7:00 - 8:00) 11/1/2021 (AM) 11/01/2021
Hydro Test End Passed 11/1/2021 (8:00 - 10:00) 11/1/2021 (AM) 11/01/2021
Fire Inspection Final Passed 11/1/2021 (8:00 - 10:00) 11/1/2021 (AM) 11/01/2021
Fire Rough-in Inspection Passed 11/1/2021 11/1/2021 (AM) 11/01/2021