Summary

PRFS202107981
Fire Suppression System
Expired
FINANCING PARTNERSHIP LP
Alteration/Repair/Replace
Add/relocate 101 sprinkler heads to accommodate the new walls and ceilings within the remodel area.
06/24/2021
07/21/2021
03/02/2022

Locations

Permits

Permit Number: PRFS202107981

Fire Suppression System
Expired
07/21/2021
03/02/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rough-in Inspection Pending
Corrections:


Miscellaneous/Other
Outstanding
09/13/2021
Must verify hangers in hard lid areas are In the proper orientation and the the structure is strong enough for that application. There is still open pipe and I must verify connections were made. Ceilings were in place in some areas so I was unable to see if brackets were secured to grid.

Fire Inspection Final Pending
Fire Rough-in Inspection Partial Pass 8/18/2021 (8:00 - 10:00) 8/18/2021 (AM) 08/18/2021
Corrections:


Miscellaneous/Other
Carried Forward
08/18/2021
Must verify hangers in hard lid areas are In the proper orientation and the the structure is strong enough for that application. There is still open pipe and I must verify connections were made. Ceilings were in place in some areas so I was unable to see if brackets were secured to grid.

Hydro Test Start Passed 8/30/2021 (10:00 - 12:00) 8/30/2021 (AM) 09/03/2021
Hydro Test End Passed 8/30/2021 (12:30 - 2:30) 8/30/2021 (PM) 09/03/2021
Fire Inspection Final Not Ready 9/10/2021 (8:00 - 10:00) 9/10/2021 (AM) 09/13/2021
Fire Rough-in Inspection Not Ready 9/10/2021 (8:00 - 10:00) 9/10/2021 (AM) 09/13/2021
Corrections:


Miscellaneous/Other
Carried Forward
09/13/2021
Must verify hangers in hard lid areas are In the proper orientation and the the structure is strong enough for that application. There is still open pipe and I must verify connections were made. Ceilings were in place in some areas so I was unable to see if brackets were secured to grid.