PRFS202116402
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Hydro Test Start | Pending | |||
Hydro Test End | Pending | |||
Fire Inspection Final | Pending | |||
Fire Rough-in Inspection | Pending | |||
Corrections:
Miscellaneous/Other
Outstanding
06/09/2022
Trash room shall be heated and sprinkler protection for trash chutes shall be connected to a wet system with an isolation valve and water flow alarm switch.
|
||||
Fire Rough-in Inspection | Partial Pass | 1/27/2022 (12:30 - 2:30) | 1/27/2022 (PM) | 01/27/2022 |
Corrections:
Miscellaneous/Other
Comment Only
01/27/2022
Rough in approved for 8th floor.
|
||||
Fire Rough-in Inspection | Partial Pass | 2/17/2022 (12:30 - 2:30) | 2/17/2022 (PM) | 02/18/2022 |
Floors 9&10 | ||||
Fire Rough-in Inspection | Partial Pass | 3/2/2022 (12:30 - 2:30) | 3/2/2022 (PM) | 03/03/2022 |
11th floor & Trash shut | ||||
Corrections:
Miscellaneous/Other
Outstanding
03/03/2022
Trash room shall be heated and sprinkler protection for trash chutes shall be connected to a wet system with an isolation valve and water flow alarm switch.
|
||||
Fire Rough-in Inspection | Partial Pass | 4/12/2022 (8:00 - 10:00) | 4/12/2022 (AM) | 04/12/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
04/12/2022
Trash room shall be heated and sprinkler protection for trash chutes shall be connected to a wet system with an isolation valve and water flow alarm switch.
|
||||
Fire Inspection Final | Partial Pass | 5/16/2022 | 5/16/2022 (AM) | 05/16/2022 |
Fire Rough-in Inspection | Partial Pass | 6/8/2022 (8:00 - 10:00) | 6/8/2022 (AM) | 06/09/2022 |
Corrections:
Miscellaneous/Other
Carried Forward
06/09/2022
Trash room shall be heated and sprinkler protection for trash chutes shall be connected to a wet system with an isolation valve and water flow alarm switch.
|