Permit Application Status

PRFS202203766


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRFS202203766
Fire Suppression System
Finaled
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
add/ relocate sprinkler heads for new ACT ceiling. Reroute some main piping and branch lines for new HVAC duct work.
04/12/2022
06/07/2022
04/23/2023
10/25/2022

Locations

Permits

Permit Number: PRFS202203766

Fire Suppression System
Finaled
06/07/2022
04/23/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Fire Rough-in Inspection Partial Pass 8/12/2022 (2:30 - 3:30) 8/12/2022 (PM) 08/12/2022
Need to add hanger to pipe near media center hallway.
Hydro Test Start Passed 8/16/2022 (8:00 - 10:00) 8/16/2022 (AM) 08/19/2022
Hydro Test End Passed 8/16/2022 (10:00 - 12:00) 8/16/2022 (AM) 08/19/2022
Fire Rough-in Inspection Partial Pass 10/05/2022
Kitchen hood sprinkler drops have been properly sealed. Still waiting on sprinkler coverage for walk-in cooler and freezer.
Fire Rough-in Inspection Passed 10/24/2022
Fire Inspection Final Passed 8/18/2022 (10:00 - 12:00) 8/18/2022 (AM) 10/24/2022