PRFS202204533
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Rough-in Inspection | Partial Pass | 3/8/2023 (12:30 - 2:30) | 3/8/2023 (PM) | 03/08/2023 |
Ok to cover upstairs bathrooms. 2 main level bathrooms sprinkler heads need to be secured. | ||||
Fire Rough-in Inspection | Partial Pass | 3/22/2023 (10:00 - 12:00) | 3/22/2023 (AM) | 03/22/2023 |
Ok to cover 1st floor bathrooms. | ||||
Hydro Test Start | Passed | 4/20/2023 (8:00 - 10:00) | 4/20/2023 (AM) | 04/20/2023 |
Starting 214psi | ||||
Hydro Test End | Passed | 4/20/2023 (10:00 - 12:00) | 4/20/2023 (AM) | 04/20/2023 |
Ending psi 210 | ||||
Fire Rough-in Inspection | Passed | 4/14/2023 (8:00 - 10:00) | 4/14/2023 (AM) | 06/16/2023 |
Acceptance Test Inspection | Passed | 06/16/2023 | ||
46 second delay on waterflow switch. | ||||
Fire Inspection Final | Passed | 06/16/2023 |