There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Rough-in Inspection | Partial Pass | 3/15/2023 (8:00 - 10:00) | 3/15/2023 (AM) | 03/15/2023 |
| Hanger not properly installed in print room. All other areas ok. Unable to inspect sprinkler head in hard-lid area. In the future rough-in inspection shall be scheduled before any ceiling is installed. | ||||
| Fire Inspection Final | Failed | 3/15/2023 (8:00 - 10:00) | 3/15/2023 (AM) | 03/15/2023 |
| Rough-in’s shall be scheduled before any ceiling has been installed. | ||||
| Fire Rough-in Inspection | Passed | 3/22/2023 (10:00 - 12:00) | 3/22/2023 (AM) | 03/22/2023 |
| Fire Inspection Final | Passed | 3/22/2023 (10:00 - 12:00) | 3/22/2023 (AM) | 03/22/2023 |