PRFS202300768
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Rough-in Inspection | Partial Pass | 3/3/2023 (8:00 - 10:00) | 3/3/2023 (AM) | 03/03/2023 |
Ok to cover hard lid | ||||
Fire Rough-in Inspection | Partial Pass | 4/12/2023 (7:00 - 8:00) | 4/12/2023 (AM) | 04/12/2023 |
Portion of center area and south wing. | ||||
24-hr Air Test Start | Passed | 4/12/2023 (7:00 - 8:00) | 4/12/2023 (AM) | 04/12/2023 |
39 psi | ||||
24-hr Air Test End | Passed | 4/13/2023 (7:00 - 8:00) | 4/13/2023 (AM) | 04/13/2023 |
Lost about 1.5 psi | ||||
Fire Rough-in Inspection | Partial Pass | 4/21/2023 (10:00 - 12:00) | 4/21/2023 (AM) | 04/21/2023 |
North area and partial west. | ||||
Acceptance Test Inspection | Passed | 05/09/2023 | ||
Fire Inspection Final | Passed | 05/09/2023 | ||
Fire Rough-in Inspection | Passed | 5/9/2023 (10:00 - 12:00) | 5/9/2023 (AM) | 05/09/2023 |