PRFS202300783
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Rough-in Inspection | Partial Pass | 6/15/2023 | 06/28/2023 | |
| North end of 4th floor. | ||||
| Fire Rough-in Inspection | Partial Pass | 6/21/2023 | 06/28/2023 | |
| 4th floor w/FM3 Corrections needed: Tcell foam needed for wires touching piping. Add hanger in 420(living rm), multiple nail plates missing. | ||||
| Fire Rough-in Inspection | Partial Pass | 6/27/2023 | 06/28/2023 | |
| 4th floor corrections have been made. | ||||
| Fire Rough-in Inspection | Partial Pass | 7/11/2023 (AM) | 07/11/2023 | |
| 3rd floor ok to cover. | ||||
| Fire Rough-in Inspection | Partial Pass | 8/14/2023 (AM) | 08/14/2023 | |
| 1st floor rough-in | ||||
| Hydro Test Start | Passed | 8/15/2023 (AM) | 08/15/2023 | |
| Floors 1 - 4. Starting psi 210 | ||||
| Hydro Test End | Passed | 8/15/2023 (PM) | 08/15/2023 | |
| Floors 1 - 4, ending psi 210. | ||||
| Hydro Test Start | Passed | 01/18/2024 | ||
| Hydro Test End | Passed | 01/18/2024 | ||
| Acceptance Test Inspection | Passed | 01/18/2024 | ||
| Fire Inspection Final | Passed | 01/26/2024 | ||
| Fire Rough-in Inspection | Passed | 01/26/2024 | ||