PRFS202304718
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Fire Rough-in Inspection | Pending | 8/1/2023 (10:00 - 12:00) | 8/1/2023 (AM) | |
Fire Rough-in Inspection | Partial Pass | 8/29/2023 (12:30 - 2:30) | 8/29/2023 (PM) | 08/30/2023 |
add head under duct, two missing heads to be installed in shop area. | ||||
Fire Rough-in Inspection | Not Ready | 9/1/2023 (10:00 - 12:00) | 9/1/2023 (AM) | 09/01/2023 |
Hydro Test Start | Passed | 9/12/2023 (12:30 - 2:30) | 9/12/2023 (PM) | 09/15/2023 |
Hydro Test End | Passed | 9/12/2023 (2:30 - 3:30) | 9/12/2023 (PM) | 09/15/2023 |
Fire Inspection Final | Passed | 9/12/2023 (2:30 - 3:30) | 9/12/2023 (PM) | 09/15/2023 |
Fire Rough-in Inspection | Passed | 9/12/2023 (2:30 - 3:30) | 9/12/2023 (PM) | 09/15/2023 |