PRFS202315258
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Hydro Test Start | Pending | |||
| Hydro Test End | Pending | |||
| Fire Inspection Final | Pending | |||
| Fire Rough-in Inspection | Pending | |||
| Fire Rough-in Inspection | Partial Pass | 12/21/2023 (8:00 - 10:00) | 12/21/2023 (AM) | 12/21/2023 |
| Inspection for the 1st floor lobby (main entrance) and 3 corridors on same level. Change the sprinkler head in the south vestibule to a pendant sprinkler head. Ensure the exterior wall of the vestibule is insulated to protect the sprinkler pipe and head. The sprinkler head in the east corridor next to suite 100 is above the ceiling. Ok to cover the corridors and lobby with the exception of those areas. | ||||