PRFS202400842
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Fire Rough-in Inspection | Partial Pass | 6/25/2024 (2:30 - 3:30) | 6/25/2024 (PM) | 06/25/2024 |
|
Corrections:
Miscellaneous/Other
Carried Forward
06/25/2024
FDC to be moved to north side per plan comments. Drain to be piped to the outside.
|
||||
| Hydro Test Start | Passed | 10/25/2024 (10:00 - 12:00) | 10/25/2024 (AM) | 10/25/2024 |
| Hydro Test End | Passed | 10/25/2024 (10:00 - 12:00) | 10/25/2024 (PM) | 10/25/2024 |
| Fire Inspection Final | Passed | 10/25/2024 | ||
| Fire Rough-in Inspection | Passed | 10/25/2024 | ||
|
Corrections:
Miscellaneous/Other
Outstanding
06/25/2024
FDC to be moved to north side per plan comments. Drain to be piped to the outside.
|
||||