Permit Application Status

PRMH201813236


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMH201813236
Mechanical/HVAC
Finaled
CYPRESS SEMICONDUCTOR INC
Repair/Replace
This is a re-submittal by the licensed contractor Utility Energy Systems for work to be done at SkyWater Technology Foundry, work is the replacement of an old propane/air mixer and vaporizer with a new unit. Unit will also be moved by approximately 50 ft from the old location.
10/23/2018
10/29/2018
04/27/2019
06/04/2019

Locations

Permits

Permit Number: PRMH201813236

Mechanical
Finaled
10/29/2018
04/27/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Partial Pass 10/31/2018 (10:00 - 12:00) 10/31/2018 (AM) 11/01/2018
Mechanical Rough-in Inspection Passed 6/4/2019 (8:00 - 10:00) 6/4/2019 (AM) 06/04/2019
Mechanical Final Inspection Passed 6/4/2019 (8:00 - 10:00) 6/4/2019 (AM) 06/04/2019