PRMH201901471
Mechanical/HVAC
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
Provide ducting and diffusers per engineered drawings.
02/20/2019
02/21/2019
09/30/2019
04/03/2019

Locations

Permits

Permit Number: PRMH201901471

Mechanical
Finaled
02/21/2019
09/30/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Passed 2/25/2019 (8:00 - 10:00) 2/25/2019 (AM) 02/25/2019
Corrections:


Miscellaneous/Other
Comment Only
02/25/2019
Ok to cover

Mechanical Rough-in Inspection Passed 3/6/2019 (8:00 - 10:00) 3/6/2019 (AM) 03/06/2019
Mechanical Final Inspection Passed 4/3/2019 (8:00 - 10:00) 4/3/2019 (AM) 04/03/2019