Permit Application Status

PRMH201905216


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMH201905216
Mechanical/HVAC
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
1. Furnish and install new 4’x11’ class I stainless steel hood with perforated supply plenum 2. Furnish and install 1- new 4700cfm transfer air fan with filters and dirty filter light 3. Distribution from transfer fan to back of house to 4- lay-in diffusers, 1- lay-in at front of house and 3 connections to perforated supply plenum at hood 4. Furnish and install new transfer air intakes at front of house 5. Thermal exhaust to be reused 6. Fabricate and install new welded grease duct from new hood to landlord main including 2- clean-outs 7. High temperature insulation from hood to landlord main
05/22/2019
07/16/2019
02/19/2020
08/23/2019

Locations

Permits

Permit Number: PRMH201905216

Mechanical
Finaled
07/16/2019
02/19/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Not Ready 7/17/2019 (2:30 - 3:30) 7/17/2019 (PM) 07/18/2019
Mechanical Rough-in Inspection Passed 7/25/2019 (12:30 - 2:30) 7/25/2019 (PM) 07/25/2019
Mechanical Final Inspection Failed 8/22/2019 (10:00 - 12:00) 8/22/2019 (PM) 08/22/2019
Mechanical Final Inspection Passed 8/23/2019 (10:00 - 12:00) 8/23/2019 (AM) 08/23/2019