Permit Application Status

PRMH202113803


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMH202113803
Mechanical/HVAC
Finaled
CITY OF BLOOMINGTON
Other
New warehouse and production facility. All new equipment (rooftop units with VAV distribution system, exhaust fans, boilers, pumps, finned tube radiation).
10/15/2021
11/03/2021
12/11/2022
06/14/2022

Locations

Permits

Permit Number: PRMH202113803

Mechanical
Finaled
11/03/2021
12/11/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Partial Pass 12/7/2021 (8:00 - 10:00) 12/7/2021 (AM) 12/07/2021
Corrections:


Miscellaneous/Other
Comment Only
12/07/2021
30 psi on temp gas line ok to turn on heaters

Mechanical Rough-in Inspection Partial Pass 12/22/2021 (8:00 - 10:00) 12/22/2021 (AM) 12/22/2021
Corrections:


Miscellaneous/Other
Comment Only
12/22/2021
Ok to insulate duct on 2ns floor

Mechanical Rough-in Inspection Partial Pass 12/28/2021 (8:00 - 10:00) 12/28/2021 (AM) 12/28/2021
Corrections:


Miscellaneous/Other
Comment Only
12/28/2021
Air test on vav piping south east. 2nd floor messianene

Mechanical Rough-in Inspection Partial Pass 1/7/2022 (8:00 - 10:00) 1/7/2022 (AM) 01/07/2022
Mechanical Rough-in Inspection Partial Pass 1/18/2022 (8:00 - 10:00) 1/18/2022 (AM) 01/18/2022
Mechanical Rough-in Inspection Partial Pass 1/31/2022 (8:00 - 10:00) 1/31/2022 (AM) 01/31/2022
Mechanical Final Inspection Failed 2/15/2022 (10:00 - 12:00) 2/15/2022 (AM) 02/15/2022
Mechanical Rough-in Inspection Partial Pass 2/15/2022 (10:00 - 12:00) 2/15/2022 (AM) 02/15/2022
Mechanical Rough-in Inspection Partial Pass 2/16/2022 (8:00 - 10:00) 2/16/2022 (AM) 02/16/2022
Mechanical Rough-in Inspection Partial Pass 3/8/2022 (8:00 - 10:00) 3/8/2022 (AM) 03/08/2022
Mechanical Rough-in Inspection Partial Pass 3/16/2022 (10:00 - 12:00) 3/16/2022 (AM) 03/16/2022
Mechanical Final Inspection Partial Pass 5/5/2022 (12:30 - 2:30) 5/5/2022 (PM) 05/05/2022
Corrections:


Miscellaneous/Other
Comment Only
05/05/2022
Air tests on 4 mini splits, and air test on the production air system holding and approved. Gas line being buried for generator, is being wrapped and sealed, and tracer wire for locate purposes…. Approved

Mechanical Final Inspection Partial Pass 5/12/2022 (10:00 - 12:00) 5/12/2022 (AM) 05/12/2022
Mechanical Final Inspection Passed 5/19/2022 (10:00 - 12:00) 5/19/2022 (AM) 05/19/2022
Mechanical Final Inspection Passed 3/18/2022 (8:00 - 10:00) 06/14/2022
Mechanical Rough-in Inspection Passed 3/30/2022 (10:00 - 12:00) 06/14/2022