Permit Application Status

PRMH202207853


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMH202207853
Mechanical/HVAC
Finaled
SEAGATE TECHNOLOGY INC
Other
Installing condensate, chilled water, hot water, natural gas, steam, house vac, process cooling, DI water, process vac, compressed air, nitrogen gas, and chemical waste piping. Installing condensing boilers, centrifugal chillers, turbo disc, hydronic pumps, heat exchanger, air control, fan coil units, hydronic heaters, humidifiers, scrubber tank, chemical treatment system, house vac system, process chilled system, CA system, process vac & DI water system
06/30/2022
08/29/2022
07/16/2024
01/18/2024

Locations

Permits

Permit Number: PRMH202207853

Mechanical
Finaled
08/29/2022
07/16/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Partial Pass 6/9/2023 (7:00 - 8:00) 6/9/2023 (AM) 06/09/2023
Corrections:


Miscellaneous/Other
Comment Only
06/09/2023
Progress viewing of this project is not yet to point of inspections, contractor will set up weekly inspections when they get a little farther along. This inspection was to familiarize inspector with the contractor and the project.

Mechanical Rough-in Inspection Partial Pass 10/11/2023 (12:30 - 2:30) 10/11/2023 (PM) 10/11/2023
Mechanical Rough-in Inspection Passed 1/18/2024 (12:30 - 2:30) 1/18/2024 (PM) 01/18/2024
Mechanical Final Inspection Passed 1/18/2024 (12:30 - 2:30) 1/18/2024 (PM) 01/18/2024