PRMH202213341
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Mechanical Final Inspection | Pending | |||
| Mechanical Rough-in Inspection | Partial Pass | 11/17/2022 (2:30 - 3:30) | 11/17/2022 (PM) | 11/21/2022 |
| Mechanical Rough-in Inspection | Passed | 11/22/2022 (2:30 - 3:30) | 11/22/2022 (PM) | 11/22/2022 |
| Mechanical Rough-in Inspection | Passed | 12/6/2022 (12:30 - 2:30) | 12/6/2022 (PM) | 12/06/2022 |
| Mechanical Rough-in Inspection | Passed | 12/19/2022 (10:00 - 12:00) | 12/19/2022 (AM) | 12/19/2022 |
| Mechanical Rough-in Inspection | Passed | 2/9/2023 (8:00 - 10:00) | 2/9/2023 (AM) | 02/09/2023 |
| New roof top unit north side roof. New Galvanized gas piping with unions and shut off valves. A. 30 psi air test. Passed. B. All Gas piping on roof stand blocks on rubber roof membrane. C. Call for final roof top unit shutdown test. D. Provide Balance report to Jesse Soller, city of Bloomington. | ||||