Summary

PRMH202213743
Mechanical/HVAC
Finaled
BCS4 MULTIFAMILY LLC
Other
Install of ductwork, Damper and GRDs. All other mechanical equipment will be provided by MMC and installed by Go Fetsch Mechanical. Install if gas piping, condensate and refrigeration piping.
11/01/2022
12/07/2022
06/15/2024
12/18/2023

Locations

Permits

Permit Number: PRMH202213743

Mechanical
Finaled
12/07/2022
06/15/2024

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Partial Pass 2/6/2023 (8:00 - 10:00) 2/6/2023 (AM) 02/06/2023
Corrections:


Miscellaneous/Other
Comment Only
02/06/2023
Temp gas ok and pre inspection walk through

Mechanical Rough-in Inspection Partial Pass 3/14/2023 (8:00 - 10:00) 3/14/2023 (AM) 03/17/2023
Mechanical Rough-in Inspection Partial Pass 3/27/2023 (8:00 - 10:00) 3/27/2023 (AM) 03/27/2023
Mechanical Rough-in Inspection Passed 3/30/2023 (10:00 - 12:00) 3/30/2023 (AM) 03/30/2023
Mechanical Rough-in Inspection Partial Pass 4/4/2023 (8:00 - 10:00) 4/4/2023 (AM) 04/04/2023
Mechanical Rough-in Inspection Partial Pass 4/6/2023 (8:00 - 10:00) 4/6/2023 (AM) 04/06/2023
Mechanical Rough-in Inspection Partial Pass 4/10/2023 (8:00 - 10:00) 4/10/2023 (AM) 04/10/2023
Mechanical Rough-in Inspection Partial Pass 4/11/2023 (12:30 - 2:30) 4/11/2023 (PM) 04/11/2023
Mechanical Rough-in Inspection Partial Pass 4/13/2023 (10:00 - 12:00) 4/13/2023 (AM) 04/13/2023
Mechanical Rough-in Inspection Partial Pass 4/24/2023 (8:00 - 10:00) 4/24/2023 (AM) 04/24/2023
Mechanical Rough-in Inspection Passed 4/25/2023 (8:00 - 10:00) 4/25/2023 (AM) 04/25/2023
Mechanical Rough-in Inspection Partial Pass 4/26/2023 (10:00 - 12:00) 4/26/2023 (AM) 04/26/2023
Mechanical Rough-in Inspection Partial Pass 5/16/2023 (2:30 - 3:30) 5/16/2023 (PM) 05/16/2023
Mechanical Rough-in Inspection Passed 5/19/2023 (10:00 - 12:00) 5/19/2023 (AM) 05/19/2023
Corrections:


Miscellaneous/Other
Comment Only
05/19/2023
Magic pac gas lines at all units of 2nd floor... approved Air test on 5 line sets for the condensors in gaage holding at 350 psi... approved

Mechanical Rough-in Inspection Partial Pass 6/1/2023 (10:00 - 12:00) 6/1/2023 (AM) 06/01/2023
Corrections:


Miscellaneous/Other
Comment Only
06/01/2023
Piping runs and fire stops on 1st floor areas 2,3,& 4. Piping and air test to areas 2,3,&4 and SE meter , holding at 31 psi. Piping and air test to oxendal and NE meter holding at 31 psi.

Mechanical Rough-in Inspection Partial Pass 06/08/2023
Corrections:


Miscellaneous/Other
Comment Only
06/08/2023
Duct sealing and rough in on first floor common areas within soffits and partial exposed... approved

Progress Inspection Partial Pass 06/21/2023
Corrections:


Miscellaneous/Other
Comment Only
06/21/2023
Phase 2, 6th floor gas piping, nail plates and fire stops through floor and framing plates.... approved

Mechanical Rough-in Inspection Passed 6/26/2023 (10:00 - 12:00) 6/26/2023 (AM) 06/26/2023
Corrections:


Miscellaneous/Other
Comment Only
06/26/2023
Phase 2, 5h floor gaslines Rough in and firestops. 6h floor dryer venting in units, and bath fan venting. Approved

Progress Inspection Partial Pass 06/30/2023
Corrections:


Miscellaneous/Other
Comment Only
06/30/2023
Phase two, 4th floorarea 5 and 1/2 of 6... gas piping runs to magic pacs viewed, nail plates and fire stops... approved

Progress Inspection Partial Pass 07/10/2023
Corrections:


Miscellaneous/Other
Comment Only
07/10/2023
Gas piping RI for magic pacs in unit of 3rd floor areas 5,6&7... fire stops, piping , and nail plates approved

Progress Inspection Partial Pass 07/13/2023
Corrections:


Miscellaneous/Other
Comment Only
07/13/2023
Dryer and bath fan venting of phase 2, floors 4th and 5th. Approved

Progress Inspection Partial Pass 07/14/2023
Corrections:


Miscellaneous/Other
Comment Only
07/14/2023
Gas piping , air test at 30psi, nail plates and fire stops on phase 2, level 2... approved Venting for bath fans, magic pac, and dryer in phase 2, floors 2&3... approved.

Progress Inspection Partial Pass 07/19/2023
Corrections:


Miscellaneous/Other
Comment Only
07/19/2023
1st floor phase 2 gas lines and air test (25psi) to piping at meter banks... approved

Progress Inspection Partial Pass 07/25/2023
Corrections:


Miscellaneous/Other
Comment Only
07/25/2023
Phase 2 supply ducing in mechanical shafts at level 6, insulation approved. Level 5 ducting install, supports and sealing... approved

Progress Inspection Partial Pass 08/22/2023
Corrections:


Miscellaneous/Other
Comment Only
08/22/2023
Mechanical shaft ducting in phase 2, areas 5&7 from floors 3-6... approved.

Progress Inspection Partial Pass 08/25/2023
Corrections:


Miscellaneous/Other
Comment Only
08/25/2023
Mechanicla shaft supply ducts at phase 2, areas 5&7 of second floor added section... approved. Note... Need to see the ducts capped from first floor prior to cloing shaft.

Progress Inspection Partial Pass 09/05/2023
Corrections:


Miscellaneous/Other
Comment Only
09/05/2023
Ducting in mechanical shaft of area1, floors 2-6 and terminating at first floor.... approved

Mechanical Final Inspection Partial Pass 9/12/2023 (8:00 - 10:00) 9/12/2023 (AM) 09/12/2023
Mechanical Final Inspection Partial Pass 9/14/2023 (10:00 - 12:00) 9/14/2023 (AM) 09/14/2023
Mechanical Final Inspection Partial Pass 9/15/2023 (8:00 - 10:00) 9/15/2023 (AM) 09/15/2023
Mechanical Final Inspection Partial Pass 9/18/2023 (10:00 - 12:00) 9/18/2023 (AM) 09/20/2023
Mechanical Final Inspection Partial Pass 9/19/2023 (10:00 - 12:00) 9/19/2023 (AM) 09/20/2023
Mechanical Final Inspection Partial Pass 9/27/2023 (10:00 - 12:00) 9/27/2023 (AM) 09/27/2023
Mechanical Final Inspection Partial Pass 9/28/2023 (10:00 - 12:00) 9/28/2023 (AM) 09/28/2023
Mechanical Final Inspection Partial Pass 9/29/2023 (10:00 - 12:00) 9/29/2023 (AM) 09/29/2023
Progress Inspection Passed 10/5/2023 (12:30 - 2:30) 10/5/2023 (PM) 10/05/2023
Corrections:


Miscellaneous/Other
Comment Only
10/05/2023
Floor 1 to 6 of phase 2... Ducting at trash shaft with radiation damper installed to bottom of ducting into 1st floor... approved Remaining transition ducting located on first floor to tie into ducting already inspected... approved

Mechanical Final Inspection Partial Pass 10/10/2023 (2:30 - 3:30) 10/10/2023 (PM) 10/10/2023
Mechanical Final Inspection Partial Pass 11/1/2023 (10:00 - 12:00) 11/1/2023 (AM) 11/01/2023
Mechanical Final Inspection Partial Pass 11/2/2023 (Morning) 11/2/2023 (AM) 11/02/2023
Mechanical Final Inspection Partial Pass 12/4/2023 (10:00 - 12:00) 12/4/2023 (AM) 12/04/2023
Mechanical Final Inspection Partial Pass 12/5/2023 (8:00 - 10:00) 12/5/2023 (AM) 12/05/2023
Mechanical Final Inspection Passed 12/14/2023 (10:00 - 12:00) 12/14/2023 (AM) 12/18/2023