Summary

PRMH202408417
Mechanical/HVAC
Finaled
8800 QUEEN LLC
Alteration/Repair/Replace
Remodel of existing office space for security upgrades at General Dynamics. See attached mechanical plans from Victus Engineering for scope of work
06/28/2024
10/14/2024
07/29/2025
01/30/2025

Locations

Permits

Permit Number: PRMH202408417

Mechanical
Finaled
10/14/2024
07/29/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Rough-in Inspection Partial Pass 10/15/2024 (10:00 - 12:00) 10/15/2024 (AM) 10/16/2024
Corrections:


Miscellaneous/Other
Carried Forward
10/16/2024
10/15 Sheetmetal rough in passed

Mechanical Rough-in Inspection Partial Pass 10/17/2024 (2:30 - 3:30) 10/17/2024 (PM) 10/17/2024
Corrections:


Miscellaneous/Other
Carried Forward
10/17/2024
10/15 Sheetmetal rough in passed

Mechanical Rough-in Inspection Partial Pass 10/28/2024 (12:30 - 2:30) 10/28/2024 (PM) 10/29/2024
Corrections:


Miscellaneous/Other
Carried Forward
10/29/2024
10/15 Sheetmetal rough in passed

Mechanical Final Inspection Partial Pass 11/15/2024 (10:00 - 12:00) 11/15/2024 (AM) 11/15/2024
Corrections:


Miscellaneous/Other
Carried Forward
11/15/2024
Heating piping hydro passed, chilled water will be flushed,finished and hydroed. HVAC system in computer room has issues

Mechanical Rough-in Inspection Partial Pass 11/15/2024 (10:00 - 12:00) 11/15/2024 (AM) 11/15/2024
Corrections:


Miscellaneous/Other
Carried Forward
11/15/2024
10/15 Sheetmetal rough in passed, 11/15 heating pipe passed chilled piping and HVAC issues outstanding, but progressing.

Mechanical Rough-in Inspection Passed 12/9/2024 (8:00 - 10:00) 12/9/2024 (AM) 12/09/2024
Corrections:


Miscellaneous/Other
Outstanding
11/15/2024
10/15 Sheetmetal rough in passed, 11/15 heating pipe passed chilled piping and HVAC issues outstanding, but progressing.

Mechanical Final Inspection Passed 1/30/2025 (8:00 - 10:00) 1/30/2025 (AM) 01/30/2025
Really nice job by MMC
Corrections:


Miscellaneous/Other
Outstanding
11/15/2024
Heating piping hydro passed, chilled water will be flushed,finished and hydroed. HVAC system in computer room has issues