Permit Application Status

PRMH202413102


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRMH202413102
Mechanical/HVAC
Permit(s) Issued
BLOOMINGTON EVER COMMERCIAL LLC
Other
complete hvac system in new 208 unit atp
10/03/2024
10/16/2024
09/08/2026

Locations

Permits

Permit Number: PRMH202413102

Mechanical
Issued
10/16/2024
09/08/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Final Inspection Pending
Mechanical Rough-in Inspection Partial Pass 4/2/2025 (10:00 - 12:00) 4/2/2025 (AM) 04/03/2025
Corrections:


Miscellaneous/Other
Carried Forward
04/03/2025
Consult few apt exhaust points are less than 10’ from air intake but are < 9’ almost 10’ on diagonal. Exhaust has no byproducts of combustion. Acceptable for variance/no hazard

Mechanical Rough-in Inspection Partial Pass 5/21/2025 (10:00 - 12:00) 5/21/2025 (AM) 05/21/2025
Corrections:


Miscellaneous/Other
Outstanding
04/03/2025
Consult few apt exhaust points are less than 10’ from air intake but are < 9’ almost 10’ on diagonal. Exhaust has no byproducts of combustion. Acceptable for variance/no hazard

Miscellaneous/Other
Outstanding
05/21/2025
5/21- Rough in pass on 5th floor East side. Ready for insulation/vapor barrier.

Mechanical Rough-in Inspection Partial Pass 5/22/2025 (10:00 - 12:00) 5/22/2025 (AM) 05/22/2025
Mechanical Rough-in Inspection Partial Pass 6/5/2025 (10:00 - 12:00) 6/5/2025 (AM) 06/06/2025
Corrections:


Miscellaneous/Other
Carried Forward
06/06/2025
6/5- 5th floor west rough in pass, ready for insulation.

Mechanical Rough-in Inspection Partial Pass 6/17/2025 (2:30 - 3:30) 6/17/2025 (PM) 06/17/2025
Corrections:


Miscellaneous/Other
Carried Forward
06/24/2025
6/5- 5th floor west rough in pass, ready for insulation.

Miscellaneous/Other
Carried Forward
06/24/2025
6/17-5th floor east sheet metal inspection before soffit install 4end rooms not complete signed on door inspection sheet.

Mechanical Rough-in Inspection Partial Pass 6/18/2025 (2:30 - 3:30) 6/18/2025 (PM) 07/02/2025
Corrections:


Miscellaneous/Other
Carried Forward
07/02/2025
6/18- 5th floor rough in. Partial pass

Mechanical Rough-in Inspection Partial Pass 6/24/2025 (12:30 - 2:30) 6/24/2025 (PM) 07/03/2025
Corrections:


Miscellaneous/Other
Outstanding
06/24/2025
6/5- 5th floor west rough in pass, ready for insulation.

Miscellaneous/Other
Outstanding
06/24/2025
6/17-5th floor east sheet metal inspection before soffit install 4end rooms not complete signed on door inspection sheet.

Miscellaneous/Other
Outstanding
07/03/2025
6/24- 5th floor rough in pass except 501,502 and 504

Mechanical Rough-in Inspection Partial Pass 7/1/2025 (8:00 - 10:00) 7/1/2025 (AM) 07/03/2025
Corrections:


Miscellaneous/Other
Outstanding
07/03/2025
Unit 427 trash exhaust rough in and insulation pass. West 4th floor partial pass.

Mechanical Rough-in Inspection Partial Pass 7/2/2025 (2:30 - 3:30) 7/2/2025 (PM) 07/03/2025
Corrections:


Miscellaneous/Other
Outstanding
07/03/2025
5th floor sheetmetal inspection sign off for soffits.

Mechanical Rough-in Inspection Partial Pass 7/3/2025 (2:30 - 3:30) 7/3/2025 (PM) 07/03/2025
Corrections:


Miscellaneous/Other
Carried Forward
07/14/2025
6/18- 5th floor rough in. Partial pass

Miscellaneous/Other
Carried Forward
07/14/2025
7/3 Sheetmetal sign off of 5th floor completed.

Mechanical Rough-in Inspection Partial Pass 7/15/2025 (8:00 - 10:00) 7/15/2025 (AM) 07/15/2025
Corrections:


Miscellaneous/Other
Outstanding
07/15/2025
4th floor rough in and 4th floor sheetmetal rough in for soffits

Mechanical Rough-in Inspection Partial Pass 7/16/2025 (12:30 - 2:30) 7/16/2025 (PM) 07/17/2025
Corrections:


Miscellaneous/Other
Carried Forward
07/21/2025
6/18- 5th floor rough in. Partial pass

Miscellaneous/Other
Carried Forward
07/21/2025
7/3 Sheetmetal sign off of 5th floor completed.

Mechanical Rough-in Inspection Partial Pass 7/17/2025 (12:30 - 2:30) 7/17/2025 (PM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025
5th floor soffit inspection pass

Mechanical Rough-in Inspection Partial Pass 7/22/2025 (12:30 - 2:30) 7/22/2025 (PM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
07/21/2025
6/18- 5th floor rough in. Partial pass

Miscellaneous/Other
Outstanding
07/21/2025
7/3 Sheetmetal sign off of 5th floor completed.

Miscellaneous/Other
Outstanding
08/08/2025
7/22- 4th floor soffit

Mechanical Rough-in Inspection Partial Pass 7/23/2025 (12:30 - 2:30) 7/23/2025 (PM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025
7/23-4th and 1st floor soffits

Mechanical Rough-in Inspection Partial Pass 7/24/2025 (8:00 - 10:00) 7/24/2025 (AM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025

Mechanical Rough-in Inspection Partial Pass 7/28/2025 (12:30 - 2:30) 7/28/2025 (PM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025
3rd floor 1st rough in inspection

Mechanical Rough-in Inspection Partial Pass 7/29/2025 (12:30 - 2:30) 7/29/2025 (PM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025
Not ready today

Mechanical Rough-in Inspection Partial Pass 8/5/2025 (10:00 - 12:00) 8/5/2025 (AM) 08/08/2025
Corrections:


Miscellaneous/Other
Outstanding
08/08/2025
8/5-2nd dollar 1st rough in

Mechanical Rough-in Inspection Partial Pass 8/6/2025 (10:00 - 12:00) 8/6/2025 (AM) 08/08/2025
Corrections:


Miscellaneous/Other
Carried Forward
08/18/2025
Fire damper walk-check code compliance

Mechanical Rough-in Inspection Passed 8/11/2025 (12:30 - 2:30) 8/11/2025 (PM) 08/11/2025
Corrections:


Miscellaneous/Other
Comment Only
08/11/2025
supply's and combustion air intake ducting for units of 3rd floor area A.... approved

Mechanical Rough-in Inspection Partial Pass 8/19/2025 (10:00 - 12:00) 8/19/2025 (AM) 08/19/2025
Corrections:


Miscellaneous/Other
Comment Only
08/19/2025
Inspection of rough work on a portion of units on second floor okay. Inspection of above ceiling connection on a portion of fan coils okay.

Mechanical Rough-in Inspection Partial Pass 8/20/2025 (2:30 - 3:30) 8/20/2025 (PM) 08/20/2025
Corrections:


Miscellaneous/Other
Comment Only
08/20/2025
Inspection of rough work for portion of units on second floor okay. Inspection of portion of soffit ducting on units on 3rd floor okay.

Mechanical Rough-in Inspection Partial Pass 8/21/2025 (8:00 - 10:00) 8/21/2025 (AM) 08/21/2025
Corrections:


Miscellaneous/Other
Comment Only
08/21/2025
Inspection of soffit ducting on remaining units on 3rd floor okay.

Mechanical Rough-in Inspection Partial Pass 9/2/2025 (12:30 - 2:30) 9/2/2025 (PM) 09/02/2025
Corrections:


Miscellaneous/Other
Comment Only
09/02/2025
Visual inspection on above ceiling fan coils on 3rd floor okay. Rough inspection on a portion of units of the east side of 1st floor okay.

Mechanical Rough-in Inspection Partial Pass 9/3/2025 (10:00 - 12:00) 9/3/2025 (AM) 09/03/2025
Corrections:


Miscellaneous/Other
Comment Only
09/03/2025
Visual inspection of a portion unit rough in’s on 1st floor on the west side of building okay.

Mechanical Rough-in Inspection Partial Pass 9/4/2025 (8:00 - 10:00) 9/4/2025 (AM) 09/04/2025
Corrections:


Miscellaneous/Other
Comment Only
09/04/2025
Inspection of rough work in remaining 1st floor units and common areas on 1st floor okay.

Mechanical Rough-in Inspection Partial Pass 9/8/2025 (10:00 - 12:00) 9/8/2025 (AM) 09/08/2025
Corrections:


Miscellaneous/Other
Comment Only
09/08/2025
Inspection of a portion of unit soffit ducting on 2nd floor of East side of the building okay.

Mechanical Rough-in Inspection Partial Pass 9/10/2025 (8:00 - 10:00) 9/10/2025 (AM) 09/10/2025
Corrections:


Miscellaneous/Other
Comment Only
09/10/2025
Inspection of soffit ducting on a portion of units on the 2nd floor is n the East side of the building okay.

Mechanical Rough-in Inspection Partial Pass 9/11/2025 (8:00 - 10:00) 9/11/2025 (AM) 09/11/2025
Corrections:


Miscellaneous/Other
Comment Only
09/11/2025
Inspection of a portion of 2nd floor units soffit ducting okay.

Mechanical Rough-in Inspection Partial Pass 9/16/2025 (10:00 - 12:00) 9/16/2025 (AM) 09/16/2025
Corrections:


Miscellaneous/Other
Comment Only
09/16/2025
Inspection of soffit ducting on remaining units on the west side of the 2nd floor okay.

Mechanical Rough-in Inspection Partial Pass 9/17/2025 (2:30 - 3:30) 9/17/2025 (PM) 09/17/2025
Mechanical Rough-in Inspection Partial Pass 9/29/2025 (10:00 - 12:00) 9/29/2025 (AM) 09/29/2025
Same Day
Mechanical Rough-in Inspection Partial Pass 10/2/2025 (8:00 - 10:00) 10/2/2025 (AM) 10/02/2025
Mechanical Rough-in Inspection Partial Pass 10/7/2025 (8:00 - 10:00) 10/7/2025 (AM) 10/07/2025
Corrections:


Miscellaneous/Other
Comment Only
10/07/2025
Inspection of soffit ducting on a portion of units on the 1st floor west side of building okay.

Mechanical Rough-in Inspection Partial Pass 10/7/2025 (2:30 - 3:30) 10/7/2025 (PM) 10/07/2025
Corrections:


Miscellaneous/Other
Comment Only
10/07/2025
Air tests for a portion of the csst gas risers okay.

Mechanical Rough-in Inspection Partial Pass 10/13/2025 (8:00 - 10:00) 10/13/2025 (AM) 10/13/2025
Corrections:


Miscellaneous/Other
Comment Only
10/13/2025
Air test for a portion of gas lines okay.

Mechanical Rough-in Inspection Partial Pass 10/14/2025 (10:00 - 12:00) 10/14/2025 (AM) 10/14/2025
Same day inspection, Ok by Dave [Resler\, Megan @ 10/14/2025 11:21 AM]
Corrections:


Miscellaneous/Other
Comment Only
10/14/2025
Air tests on a portion of gas risers okay.

Miscellaneous/Other
Comment Only
10/14/2025
Air tests on a portion of gas risers okay.

Mechanical Rough-in Inspection Partial Pass 10/15/2025 (8:00 - 10:00) 10/15/2025 (AM) 10/15/2025
Corrections:


Miscellaneous/Other
Comment Only
10/15/2025
Inspection of first floor west side fan coils in units okay. Air tests for a portion of gas risers okay.

Mechanical Rough-in Inspection Partial Pass 10/16/2025 10/16/2025 (AM) 10/16/2025
Corrections:


Miscellaneous/Other
Comment Only
10/16/2025
Air test on a portion of gas risers okay.

Mechanical Rough-in Inspection Partial Pass 10/20/2025 (8:00 - 10:00) 10/20/2025 (AM) 10/20/2025
Corrections:


Miscellaneous/Other
Comment Only
10/20/2025
Air tests on a portion of gas risers okay.

Mechanical Rough-in Inspection Partial Pass 10/20/2025 (2:30 - 3:30) 10/20/2025 (PM) 10/20/2025
Corrections:


Miscellaneous/Other
Comment Only
10/20/2025
Air tests on remaining gas risers on west side of building ok.

Mechanical Rough-in Inspection Partial Pass 10/28/2025 (12:30 - 2:30) 10/28/2025 (PM) 10/28/2025
Mechanical Rough-in Inspection Partial Pass 10/30/2025 (8:00 - 10:00) 10/30/2025 (AM) 10/30/2025
Corrections:


Miscellaneous/Other
Comment Only
10/30/2025
Visual inspection of 1st floor common area soffit ducting and fan coil units okay.

Mechanical Rough-in Inspection Partial Pass 11/6/2025 (12:30 - 2:30) 11/6/2025 (PM) 11/06/2025
Mechanical Rough-in Inspection Partial Pass 11/10/2025 (8:00 - 10:00) 11/10/2025 (AM) 11/10/2025
Corrections:


Miscellaneous/Other
Comment Only
11/10/2025
Air test for a portion of gas risers on the west side of building okay.

Mechanical Rough-in Inspection Partial Pass 11/12/2025 (12:30 - 2:30) 11/12/2025 (PM) 11/12/2025
Corrections:


Miscellaneous/Other
Comment Only
11/12/2025
Air tests on remaining gas risers for units on west side of building okay.

Mechanical Rough-in Inspection Partial Pass 11/13/2025 (8:00 - 10:00) 11/13/2025 (AM) 11/13/2025
Mechanical Final Inspection Partial Pass 1/26/2026 (10:00 - 12:00) 1/26/2026 (AM) 01/26/2026
Corrections:


Miscellaneous/Other
Comment Only
01/26/2026
Final inspection of 5th and 4th floor units okay.

Mechanical Final Inspection Partial Pass 01/28/2026
Corrections:


Miscellaneous/Other
Comment Only
01/28/2026
Final inspection of 3rd floor units okay.

Mechanical Final Inspection Partial Pass 2/17/2026 (8:00 - 10:00) 2/17/2026 (AM) 02/17/2026
Inspect 1-3 floors
Corrections:


Miscellaneous/Other
Comment Only
02/17/2026
Final inspection of units on 1st and 2nd floor okay.

Mechanical Final Inspection Partial Pass 2/18/2026 (8:00 - 10:00) 2/18/2026 (AM) 02/18/2026
Gas main air test
Corrections:


Miscellaneous/Other
Comment Only
02/18/2026
Visual inspection and air test of 2 psi gas main okay. Inspection of garage heaters and venting okay. Still has gas work on patio to be completed and inspected.

Mechanical Final Inspection Partial Pass 3/3/2026 (8:00 - 10:00) 3/3/2026 (AM) 03/03/2026
Corrections:


Miscellaneous/Other
Comment Only
03/03/2026
Inspection of common area's on 1st floor okay. Inspection of roof top equipment okay, but contractor needs to change out vent limiters on regulators and swap split rings on gas piping serving rtu's to galvanized. Contractor to still label all gas piping in garage, and provide test of exhaust system in garage, rtu's, and dampers.

Mechanical Final Inspection Partial Pass 3/4/2026 (8:00 - 10:00) 3/4/2026 (AM) 03/04/2026
smoke dampers
Corrections:


Miscellaneous/Other
Comment Only
03/04/2026
Inspection of all fire and smoke dampers okay.

Mechanical Final Inspection Partial Pass 3/12/2026 (8:00 - 10:00) 3/12/2026 (AM) 03/12/2026
Garage
Corrections:


Miscellaneous/Other
Comment Only
03/12/2026
Inspection and testing of parking garage exhaust system okay. All labeling of gas piping in garage has been completed. Will still need to inspect work yet to be completed in courtyard area.