Summary

PRMH202413102
Mechanical/HVAC
Permit(s) Issued
BLOOMINGTON EVER COMMERCIAL LLC
Other
complete hvac system in new 208 unit atp
10/03/2024
10/16/2024
12/14/2025

Locations

Permits

Permit Number: PRMH202413102

Mechanical
Issued
10/16/2024
12/14/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Final Inspection Pending
Mechanical Rough-in Inspection Pending 6/18/2025 (2:30 - 3:30) 6/18/2025 (PM)
Mechanical Rough-in Inspection Pending 6/24/2025 (12:30 - 2:30) 6/24/2025 (PM)
Corrections:


Miscellaneous/Other
Outstanding
06/24/2025
6/5- 5th floor west rough in pass, ready for insulation.

Miscellaneous/Other
Outstanding
06/24/2025
6/17-5th floor east sheet metal inspection before soffit install 4end rooms not complete signed on door inspection sheet.

Mechanical Rough-in Inspection Partial Pass 4/2/2025 (10:00 - 12:00) 4/2/2025 (AM) 04/03/2025
Corrections:


Miscellaneous/Other
Carried Forward
04/03/2025
Consult few apt exhaust points are less than 10’ from air intake but are < 9’ almost 10’ on diagonal. Exhaust has no byproducts of combustion. Acceptable for variance/no hazard

Mechanical Rough-in Inspection Partial Pass 5/21/2025 (10:00 - 12:00) 5/21/2025 (AM) 05/21/2025
Corrections:


Miscellaneous/Other
Outstanding
04/03/2025
Consult few apt exhaust points are less than 10’ from air intake but are < 9’ almost 10’ on diagonal. Exhaust has no byproducts of combustion. Acceptable for variance/no hazard

Miscellaneous/Other
Outstanding
05/21/2025
5/21- Rough in pass on 5th floor East side. Ready for insulation/vapor barrier.

Mechanical Rough-in Inspection Partial Pass 5/22/2025 (10:00 - 12:00) 5/22/2025 (AM) 05/22/2025
Mechanical Rough-in Inspection Partial Pass 6/5/2025 (10:00 - 12:00) 6/5/2025 (AM) 06/06/2025
Corrections:


Miscellaneous/Other
Carried Forward
06/06/2025
6/5- 5th floor west rough in pass, ready for insulation.

Mechanical Rough-in Inspection Partial Pass 6/17/2025 (2:30 - 3:30) 6/17/2025 (PM) 06/17/2025
Corrections:


Miscellaneous/Other
Carried Forward
06/24/2025
6/5- 5th floor west rough in pass, ready for insulation.

Miscellaneous/Other
Carried Forward
06/24/2025
6/17-5th floor east sheet metal inspection before soffit install 4end rooms not complete signed on door inspection sheet.