Summary

PRMH202416716
Mechanical/HVAC
Permit(s) Issued
;
SEAGATE TECHNOLOGY INC
Alteration/Repair/Replace
Installing condensate, chilled water, hot water, natural gas, steam, house vac, process cooling, DI water, process vac, compressed air, nitrogen gas, and chemical waste piping. Installing condensing boilers, centrifugal chillers, turbo disc, hydronic pumps, heat exchanger, air control, fan coil units, hydronic heaters, humidifiers, scrubber tank, chemical treatment system,house vac system, process chilled system, CA system, process vac & DI water system.
12/31/2024
03/10/2025
08/10/2026

Locations

Permits

Permit Number: PRMH202416716

Mechanical
Issued
03/10/2025
08/10/2026

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Mechanical Final Inspection Pending
Progress Inspection Partial Pass 4/23/2025 (8:00 - 10:00) 4/23/2025 (AM) 04/23/2025
Corrections:


Miscellaneous/Other
Carried Forward
04/23/2025
4/23- Walk through entire building project with fitter and tinner foreman.

Mechanical Rough-in Inspection Partial Pass 9/2/2025 (2:30 - 3:30) 9/2/2025 (PM) 09/02/2025
Corrections:


Miscellaneous/Other
Comment Only
09/02/2025
Visual inspection and air test for 3" gas main that enters on Northeast side of the building okay.

Mechanical Rough-in Inspection Not Ready 9/3/2025 (2:30 - 3:30) 9/3/2025 (PM) 09/03/2025
Corrections:


Miscellaneous/Other
Comment Only
09/03/2025
Contractor to reschedule hydro test when they receive another high pressure hose.

Mechanical Final Inspection Partial Pass 9/25/2025 (10:00 - 12:00) 9/25/2025 (AM) 09/25/2025
Corrections:


Miscellaneous/Other
Comment Only
09/25/2025
Hydrostatic test on supply heating water (HWS per plan) piping okay.

Mechanical Rough-in Inspection Partial Pass 11/19/2025 (8:00 - 10:00) 11/19/2025 (AM) 11/19/2025
Corrections:


Miscellaneous/Other
Comment Only
11/19/2025
Visual inspection of rough ducting and labeling okay. As discussed, schedule another inspection when when more progress is made and when specific areas are full completed.

Mechanical Rough-in Inspection Passed 12/17/2025 (12:30 - 2:30) 12/17/2025 (PM) 12/17/2025
Corrections:


Miscellaneous/Other
Comment Only
12/17/2025
Boiler testing with the state of Mn. The state boiler inspector did all the testing of the two boiler units, boilers passed state inspection.

Mechanical Final Inspection Partial Pass 2/11/2026 2/11/2026 (AM) 02/11/2026
Corrections:


Miscellaneous/Other
Comment Only
02/11/2026
Visual final still needed for installation of motors for air dampers on 1st floor. Still need documentation for chiller startup, boiler startup, and documentation of where and what type of refrigerant leak detection was installed.