PRMH202511441
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Mechanical Final Inspection | Pending | |||
| Mechanical Rough-in Inspection | Passed | 2/6/2026 (12:30 - 2:30) | 2/6/2026 (PM) | 02/06/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/06/2026
This was a mock up of the unit that is replacing the older unit in each room. Contractor went through what they will have to do in order to tie unit to the ductwork.
|
||||
| Mechanical Rough-in Inspection | Passed | 2/11/2026 (10:00 - 12:00) | 2/11/2026 (AM) | 02/11/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
02/11/2026
Hydro test for piping at wells 1,2,& 3 up to the loading dock tie in holding pressure at 100 psi... tested for 45 minutes. Approved
Buriel depth of piping on sand bed... approved
|
||||