PRMH202601495
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Mechanical Final Inspection | Pending | |||
| Mechanical Rough-in Inspection | Pending | |||
| Mechanical Rough-in Inspection | Not Ready | 3/27/2026 (12:30 - 2:30) | 3/27/2026 (PM) | 03/27/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/27/2026
Inspection canceled and rescheduled to another day next week.
|
||||
| Mechanical Rough-in Inspection | Not Ready | 3/30/2026 (12:30 - 2:30) | 3/30/2026 (PM) | 03/30/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
03/30/2026
This was a consult on how the grease duct will be tested. Contractor to install the access openings in duct where required, duct can be blocked off at hood and before the connection point of the existing tie in duct. Smoke test the new duct and the last weld can be light tested.
Set up reinspection when ready for test.
|
||||
| Mechanical Rough-in Inspection | Passed | 4/1/2026 (10:00 - 12:00) | 4/1/2026 (AM) | 04/01/2026 |
|
Corrections:
Miscellaneous/Other
Comment Only
04/01/2026
Smoke test on grease duct, no leaks found. Test approved
|
||||