Summary

PRPL201701037
Plumbing
Finaled
NORTH PAD DEVELOPMENT LLC
Alteration/Remodel
Restroom buildouts for 4th & 5th floors of office tower.
03/02/2017
03/03/2017
02/16/2020
07/17/2017

Locations

Permits

Permit Number: PRPL201701037

Plumbing
Finaled
03/03/2017
02/16/2020

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Partial Pass 07/06/2017
Plumbing Rough-in Inspection Passed 3/28/2017 (10:00 - 12:00) 3/28/2017 07/06/2017
Corrections:


Miscellaneous/Other
Carried Forward
03/28/2017
Air test on all waste vent and water passages. Tape or insulate water pipe where touching studs. Cut 3/8 inch rods on copper tear drop water pipe hangers for insulation to fit. Secure 1/2 inch hot water riser on lav in women's room.

Miscellaneous/Other
Outstanding
03/28/2017
Previous comments were for 4 th floor. Same comments for fifth floor. Secure water risers. Both floors move waterhammer arrestors to a location between last 2 flushometer valves in all bathrooms. Allaitests on 5th floor approved.

Plumbing Rough-in Inspection Passed 7/6/2017 (8:00 - 10:00) 7/6/2017 (AM) 07/06/2017
4th floor final
Corrections:


Miscellaneous/Other
Outstanding
03/28/2017
Air test on all waste vent and water passages. Tape or insulate water pipe where touching studs. Cut 3/8 inch rods on copper tear drop water pipe hangers for insulation to fit. Secure 1/2 inch hot water riser on lav in women's room.

Plumbing Final Inspection Passed 7/17/2017 (2:30 - 3:30) 7/17/2017 07/17/2017