| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Plumbing Final Inspection | Pending | |||
| Plumbing Rough-in Inspection | Partial Pass | 5/15/2017 (8:00 - 10:00) | 5/15/2017 | 05/15/2017 |
| 5# air on underground for lower level(garage level)bathrooms-OK to cover-contractor to leave isolation valve and backwater valve accessible with a box | ||||
| Plumbing Rough-in Inspection | Passed | 5/22/2017 (10:00 - 12:00) | 5/22/2017 | 05/22/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/22/2017
Airtest on waste and vent for 2 units on 2nd floor.
|
||||
| Plumbing Rough-in Inspection | Passed | 5/31/2017 (12:30 - 2:30) | 5/31/2017 | 05/31/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/31/2017
Airtest on 1 suite 2 bathrooms on second floor south. Ok to cover.
|
||||
| Plumbing Rough-in Inspection | Passed w/ Conditions | 6/7/2017 (8:00 - 10:00) | 6/7/2017 | 06/08/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/08/2017
Visual on floor drain to interceptor. Ok to cover with no air test.
Ceiling piping in garage for upper units, visual inspection, future airtest required.
Piping from stacks below First floor ceiling need an eight or two foot setback.
|
||||
| Plumbing Rough-in Inspection | Passed | 6/19/2017 (10:00 - 12:00) | 6/19/2017 | 06/19/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/19/2017
Airtest on RWL and ORWL/east ok to insulate.
Airtest on waste and vent for public bathrooms second floor.
|
||||
| Plumbing Rough-in Inspection | Passed | 6/27/2017 (12:30 - 2:30) | 6/27/2017 | 06/27/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/27/2017
Airtest on 4 risers on 1st floor south
Airtest on lav risers on 2nd floor.
|
||||
| Plumbing Rough-in Inspection | Passed | 7/10/2017 (12:30 - 2:30) | 7/10/2017 | 07/10/2017 |
| ! W&V and ! rainwater | ||||
| Plumbing Rough-in Inspection | Passed | 7/20/2017 (12:30 - 2:30) | 7/20/2017 | 07/20/2017 |
| Plumbing Rough-in Inspection | Passed | 8/11/2017 (8:00 - 10:00) | 8/11/2017 | 08/11/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/11/2017
Visual and airtest on waste and vent for Ben and Jerry's and Dunkin' donuts. Visual only on sink for Bucket's, future airtest.
Visual and airtest on under floor piping for Outback bar.
Visual on underfloor grease waste for main kitchen, future airtest.
Verbal approval on configuration of waste piping with grinder pump for bar in pool area. R.F.I. Will be submitted for documentation of approval.
|
||||
| Plumbing Rough-in Inspection | Passed | 8/15/2017 (10:00 - 12:00) | 8/15/2017 | 08/15/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/15/2017
Air test on U.G. waste and vent for aquatics bar. Air test on rerouted grease waste below floor for main kitchen. Air test on rerouted in ceiling piping for women's restroom. OK. to install sump basket for drain in outside stair well without a manometer test.
Visual inspection on sink in loose goose.
2" vent header under bar where code requires. Submit dishwasher specs so Rebecca can discuss I. W.'s with Erik Solie.
|
||||
| Plumbing Rough-in Inspection | Passed | 8/18/2017 (8:00 - 10:00) | 8/18/2017 | 08/18/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
08/18/2017
Airtest on barnwood bar, grease waste at meeting rooms, visual on 2 hand sinks, hangry ad a wolf bar.
|
||||
| Plumbing Rough-in Inspection | Passed | 8/25/2017 (10:00 - 12:00) | 8/25/2017 | 08/25/2017 |
| Plumbing Rough-in Inspection | Passed | 9/6/2017 (10:00 - 12:00) | 9/6/2017 | 09/06/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/06/2017
Airtest on all waste and vent for the Great Wolf Restaurant.
Airtest on all above ground waste, vent and waters for the Aquatics Bar.
Ok to cover all.
|
||||
| Plumbing Rough-in Inspection | Passed | 10/10/2017 (12:30 - 2:30) | 10/10/2017 | 10/10/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/10/2017
All waste and vent for men’s and women’s shower rooms completed. Water almost completed.
Manometer tests on men’s and women’s bathrooms on the lower level.
Manometer tests not required on kitchens and bars. Visual only.
First look at grease interceptor. Will see again when completed.
|
||||
| Plumbing Rough-in Inspection | Not Ready | 10/20/2017 (Afternoon) | 10/20/2017 | 10/20/2017 |
| Plumbing Rough-in Inspection | Passed | 11/6/2017 (8:00 - 10:00) | 11/6/2017 | 11/06/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/06/2017
Airtest on entire gas main in Hungry As A Wolf
|
||||
| Plumbing Final Inspection | Partial Pass | 11/13/2017 (8:00 - 10:00) | 11/13/2017 | 11/13/2017 |
|
Corrections:
Miscellaneous/Other
Comment Only
11/13/2017
Walk through-fixtures installed, indirects ran
|
||||
| Above Ground Plumbing Inspection | VOID | 11/15/2017 | ||