PRPL201707803
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 9/8/2017 (10:00 - 12:00) | 9/8/2017 | 09/12/2017 |
Corrections:
Miscellaneous/Other
Outstanding
09/12/2017
Install hand sinks
Install expansion tank on water heater.
Check r.i. Heights on sink waste.
3rd strike on wrong elevation of waste stub outs for sinks.
Wall will be broken out and r.i. Adjusted in future.
|
||||
Plumbing Final Inspection | Not Ready | 10/20/2017 (8:00 - 10:00) | 10/20/2017 | 10/20/2017 |
Corrections:
Miscellaneous/Other
Carried Forward
10/20/2017
Temporary occupancy.
Need to install hand sink, seal mop sink, and possible new baking appliance to be installed.
|
||||
Plumbing Final Inspection | Partial Pass | 1/3/2018 (8:00 - 10:00) | 1/3/2018 | 01/03/2018 |
Corrections:
Miscellaneous/Other
Outstanding
10/20/2017
Temporary occupancy.
Need to install hand sink, seal mop sink, and possible new baking appliance to be installed.
|
||||
Miscellaneous/Other
Outstanding
01/03/2018
Fixtures set and sealed, need proper back flow protection for chemical dispensers (2)
|
||||
Plumbing Rough-in Inspection | VOID | 01/03/2018 | ||
Plumbing Final Inspection | Passed | 2/13/2018 (10:00 - 12:00) | 2/13/2018 | 02/13/2018 |