PRPL201811909
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 12/19/2018 (10:00 - 12:00) | 12/19/2018 (AM) | 12/19/2018 |
Corrections:
Miscellaneous/Other
Comment Only
12/19/2018
Airtest on under ground waste and vent for bathrooms. Airtest on on storm drain
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/3/2019 (12:30 - 2:30) | 1/3/2019 (PM) | 01/03/2019 |
Corrections:
Miscellaneous/Other
Comment Only
01/03/2019
Airtest on underground grease waste and storm sewer for roof drains.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 2/6/2019 (10:00 - 12:00) | 2/6/2019 (AM) | 02/06/2019 |
Corrections:
Miscellaneous/Other
Comment Only
02/06/2019
Airtest on 2 roof drains and 2 overflow drains.
Airtest on 2 bathrooms and back of the house 2nd floor.
|
||||
Plumbing Rough-in Inspection | Passed | 4/9/2019 (12:30 - 2:30) | 4/9/2019 (PM) | 04/09/2019 |
Corrections:
Miscellaneous/Other
Comment Only
04/09/2019
Airtest on both bars. Rough in complete.
|
||||
Plumbing Final Inspection | Partial Pass | 7/16/2019 (12:30 - 2:30) | 7/16/2019 (PM) | 07/16/2019 |
Corrections:
Noise Limits
Comment Only
07/16/2019
Partial final
Manometer test ok
Elevator pit sump pumps meet engineer’s specifications
Future inspection:
Dish machine
Grates on floor sinks
Trap wraps
Test balls out of floor drains
Clean outs accessible
Secure 2 mop sink faucets
Caulk mop sink
Complete drain for soda service counter
Fire up cooking equipment
Test R.P.Z.
Please forward to chuck
|
||||
Plumbing Final Inspection | Passed w/ Conditions | 7/22/2019 (8:00 - 10:00) | 7/22/2019 (AM) | 07/22/2019 |
Corrections:
Miscellaneous/Other
Comment Only
07/22/2019
Final with conditions
|
||||
Miscellaneous/Other
Comment Only
07/22/2019
Test R.P.Z.
Screw down floor drain covers
Light missing in mop room on 2nd floor
Caulk hand sink in kitchen
Replace drain shut off valve on dishwasher with I.P. ball valve
|