Summary

PRPL201815056
Plumbing
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
New bar and restaurant buildout **Work to be done in 339 South Ave (location not available in system).
12/10/2018
12/26/2018
06/24/2019
11/12/2019

Locations

Permits

Permit Number: PRPL201815056

Plumbing
Finaled
12/26/2018
06/24/2019

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 1/15/2019 (10:00 - 12:00) 1/15/2019 (AM) 01/15/2019
Corrections:


Miscellaneous/Other
Comment Only
01/15/2019
2nd floor prep kitchen airtested Ok to cover.

Plumbing Rough-in Inspection Partial Pass 1/29/2019 (10:00 - 12:00) 1/29/2019 (AM) 01/29/2019
Corrections:


Miscellaneous/Other
Comment Only
01/29/2019
Gas line airtest ok Waste, vent and waters ok Bar not completed call for reinspection.

Plumbing Rough-in Inspection Passed 8/30/2019 (10:00 - 12:00) 8/30/2019 (AM) 08/30/2019
Plumbing Final Inspection Partial Pass 10/31/2019 (10:00 - 12:00) 10/31/2019 (AM) 10/31/2019
Corrections:


Miscellaneous/Other
Comment Only
10/31/2019
Turn water on so I can check for leaks Hook up 3 hand sinks Caulk hand sinks Water heater is ok Install garbage grinder with side tray and dishwasher Bar not ready to be looked at

Plumbing Final Inspection Passed 11/5/2019 (8:00 - 10:00) 11/5/2019 (AM) 11/05/2019
Plumbing Final Inspection Partial Pass 11/7/2019 (10:00 - 12:00) 11/7/2019 (PM) 11/07/2019
Corrections:


Miscellaneous/Other
Comment Only
11/07/2019
Temp occupancy

Plumbing Final Inspection Passed 11/12/2019 (10:00 - 12:00) 11/12/2019 (AM) 11/12/2019