PRPL201904084
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Plumbing Rough-in Inspection | Partial Pass | 6/14/2019 (8:00 - 10:00) | 6/14/2019 (AM) | 06/14/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/14/2019
Approval to leave in existing back water valve.
Based on load calculations, 172.8 D.F.U’s may be on a 4” line. Plumber will verify existing D.F.U.’s.
Approval to run pipe at 3/16th” slope based on existing elevations.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/21/2019 (8:00 - 10:00) | 6/21/2019 (AM) | 06/21/2019 |
| Plumbing Rough-in Inspection | Partial Pass | 6/27/2019 (8:00 - 10:00) | 6/27/2019 (AM) | 06/27/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/27/2019
Underground west locker room 5# ok to cover.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 7/9/2019 (8:00 - 10:00) | 7/9/2019 (AM) | 07/09/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/09/2019
Air test on 5 bathrooms. Vent termination location undetermined.
Examine check valve in man hole to determine if it’s operational or replace.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 7/30/2019 (8:00 - 10:00) | 7/30/2019 (AM) | 07/30/2019 |
| Plumbing Rough-in Inspection | Partial Pass | 7/30/2019 (2:30 - 3:30) | 7/30/2019 (PM) | 07/30/2019 |
| Plumbing Rough-in Inspection | Passed | 9/18/2019 (8:00 - 10:00) | 9/18/2019 (AM) | 09/18/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/18/2019
4# air test on primary rain leader and over flow.
|
||||
| Plumbing Final Inspection | Partial Pass | 9/24/2019 (8:00 - 10:00) | 9/24/2019 (AM) | 09/24/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/24/2019
Area B manometer holds-final
|
||||
| Plumbing Final Inspection | Passed | 10/8/2019 (12:30 - 2:30) | 10/8/2019 (PM) | 10/08/2019 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/08/2019
Final manometer
|
||||