PRPL201912243
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 12/2/2019 (12:30 - 2:30) | 12/2/2019 (PM) | 12/02/2019 |
Corrections:
Miscellaneous/Other
Comment Only
12/02/2019
Informational
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/10/2020 (2:30 - 3:30) | 3/10/2020 (PM) | 03/10/2020 |
Plumbing Rough-in Inspection | Partial Pass | 3/12/2020 (12:30 - 2:30) | 3/12/2020 (PM) | 03/12/2020 |
Corrections:
Miscellaneous/Other
Comment Only
03/12/2020
Air test on sanitary and flammable under ground in the garage
Air test on piping in cistern
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/16/2020 (10:00 - 12:00) | 3/16/2020 (AM) | 03/16/2020 |
Plumbing Rough-in Inspection | Partial Pass | 3/27/2020 (12:30 - 2:30) | 3/27/2020 (PM) | 03/27/2020 |
Plumbing Rough-in Inspection | Partial Pass | 4/10/2020 (10:00 - 12:00) | 4/10/2020 (AM) | 04/10/2020 |
Plumbing Rough-in Inspection | Partial Pass | 4/15/2020 (8:00 - 10:00) | 4/15/2020 (AM) | 04/15/2020 |
Plumbing Rough-in Inspection | Partial Pass | 4/17/2020 (10:00 - 12:00) | 4/17/2020 (AM) | 04/17/2020 |
Corrections:
Miscellaneous/Other
Comment Only
04/17/2020
Airtest on most of the grease waste and sanitary for commercial kitchen. Approved. Future air test on remaining pipe.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 4/21/2020 (10:00 - 12:00) | 4/21/2020 (AM) | 04/21/2020 |
Plumbing Rough-in Inspection | Partial Pass | 4/23/2020 (10:00 - 12:00) | 4/23/2020 (AM) | 04/23/2020 |
Corrections:
Miscellaneous/Other
Comment Only
04/23/2020
Air test on under ground for commercial kitchen.
|
||||
Plumbing Rough-in Inspection | Passed | 5/4/2020 (12:30 - 2:30) | 5/4/2020 (PM) | 05/04/2020 |
Plumbing Rough-in Inspection | Partial Pass | 5/13/2020 (Afternoon) | 5/13/2020 (PM) | 05/13/2020 |
Corrections:
Miscellaneous/Other
Comment Only
05/13/2020
Underground for trench drains in healthcare building
|
||||
Plumbing Rough-in Inspection | Partial Pass | 5/21/2020 (2:30 - 3:30) | 5/21/2020 (PM) | 05/21/2020 |
Corrections:
Miscellaneous/Other
Comment Only
05/21/2020
Informational inspection. Approval to install horizontal wet vent including a tub, separate shower and emergency floor drain per 2015 MN Plumbing code chapter 2, definition of a “bathroom group.”
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/15/2020 (10:00 - 12:00) | 7/15/2020 (AM) | 07/15/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/15/2020
Walk through apartments with Brent. Answer questions about sizing on vertical run of horizontal wet vent and question about transitioning from cast to plastic in the ceiling.
|
||||
Plumbing Final Inspection | Partial Pass | 7/22/2020 (12:30 - 2:30) | 7/22/2020 (PM) | 07/22/2020 |
Corrections:
Miscellaneous/Other
Comment Only
07/22/2020
Informational
Proposed layout for 5th floor horizontal wet venting approved.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/6/2020 (12:30 - 2:30) | 8/6/2020 (PM) | 08/06/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/06/2020
Air test in 1st wing. 2 failed. Will retest tomorrow.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/6/2020 (12:30 - 2:30) | 8/6/2020 (PM) | 08/06/2020 |
Plumbing Rough-in Inspection | Partial Pass | 8/7/2020 (12:30 - 2:30) | 8/7/2020 (PM) | 08/07/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/07/2020
Air tests on 2nd wing
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/7/2020 (12:30 - 2:30) | 8/7/2020 (PM) | 08/07/2020 |
Plumbing Rough-in Inspection | Partial Pass | 8/18/2020 (12:30 - 2:30) | 8/18/2020 (PM) | 08/18/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/18/2020
Progress inspection
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/20/2020 (12:30 - 2:30) | 8/20/2020 (PM) | 08/20/2020 |
Corrections:
Minimum Clearance
Comment Only
08/20/2020
Air test on under ground storm sewer in courtyard
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/21/2020 (12:30 - 2:30) | 8/21/2020 (PM) | 08/21/2020 |
Corrections:
Miscellaneous/Other
Comment Only
08/21/2020
Under ground in courtyard approved
1 drain, 2 lines
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/26/2020 (12:30 - 2:30) | 8/27/2020 (PM) | 08/27/2020 |
Plumbing Rough-in Inspection | Partial Pass | 9/14/2020 (12:30 - 2:30) | 9/14/2020 (PM) | 09/14/2020 |
Corrections:
Miscellaneous/Other
Comment Only
09/14/2020
3rd floor walk through and sign off
Ok to cover
|
||||
Plumbing Rough-in Inspection | Pending | 9/15/2020 | 09/15/2020 | |
Plumbing Rough-in Inspection | Partial Pass | 9/15/2020 (AM) | 09/15/2020 | |
Plumbing Rough-in Inspection | Partial Pass | 9/16/2020 (AM) | 09/16/2020 | |
Plumbing Rough-in Inspection | Not Ready | 9/18/2020 (AM) | 09/18/2020 | |
Plumbing Rough-in Inspection | Partial Pass | 9/21/2020 (12:30 - 2:30) | 9/21/2020 (PM) | 09/21/2020 |
Plumbing Rough-in Inspection | Partial Pass | 10/8/2020 (10:00 - 12:00) | 10/8/2020 (AM) | 10/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/08/2020
5# air kitchen underground and venting. Water piping complete. Ok to cover
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/23/2020 (Afternoon) | 10/23/2020 (PM) | 10/23/2020 |
Corrections:
Miscellaneous/Other
Comment Only
10/23/2020
Rough-in air test on stacked kitchens in assisted living.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 11/3/2020 (12:30 - 2:30) | 11/3/2020 (PM) | 11/03/2020 |
Corrections:
Miscellaneous/Other
Comment Only
11/03/2020
Air test on public bathrooms- first floor
Air test on spa
|
||||
Plumbing Final Inspection | Partial Pass | 12/4/2020 (12:30 - 2:30) | 12/4/2020 (PM) | 12/04/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/04/2020
Third floor walk through
Signed cards some counter tops not installed plus one mop sink, laundry room
|
||||
Plumbing Final Inspection | Partial Pass | 12/8/2020 (12:30 - 2:30) | 12/8/2020 (PM) | 12/08/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/08/2020
2nd floor walk through, most rooms completed. Waiting for laundry.
|
||||
Plumbing Final Inspection | Partial Pass | 12/10/2020 (12:30 - 2:30) | 12/10/2020 (PM) | 12/10/2020 |
Plumbing Final Inspection | Partial Pass | 12/11/2020 (12:30 - 2:30) | 12/11/2020 (PM) | 12/11/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/11/2020
Manometer tests completed
|
||||
Plumbing Final Inspection | Partial Pass | 12/14/2020 (12:30 - 2:30) | 12/14/2020 (PM) | 12/14/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/14/2020
1st floor walk through
Partially completed
|
||||
Plumbing Final Inspection | Partial Pass | 12/21/2020 (12:30 - 2:30) | 12/21/2020 (PM) | 12/21/2020 |
Plumbing Final Inspection | Partial Pass | 12/22/2020 (12:30 - 2:30) | 12/22/2020 (PM) | 12/22/2020 |
Corrections:
Miscellaneous/Other
Comment Only
12/22/2020
3rd floor and 2nd floor not completed. Working on public restrooms on 1st floor. Will be done with 1st floor public restrooms by the end of the day tomorrow and water turned on.
|
||||
Plumbing Final Inspection | Partial Pass | 12/23/2020 (10:00 - 12:00) | 12/24/2020 (AM) | 12/27/2020 |
Plumbing Final Inspection | Partial Pass | 1/14/2021 (10:00 - 12:00) | 1/14/2021 (AM) | 01/14/2021 |
Corrections:
Miscellaneous/Other
Comment Only
01/14/2021
Final on 3 kitchens
|
||||
Plumbing Final Inspection | Partial Pass | 1/28/2021 (12:30 - 2:30) | 1/28/2021 (PM) | 01/28/2021 |
Corrections:
Miscellaneous/Other
Comment Only
01/28/2021
Phase 1 final
|
||||
Plumbing Final Inspection | Not Ready | 6/29/2021 (10:00 - 12:00) | 6/29/2021 (AM) | 06/29/2021 |
Plumbing Final Inspection | Not Ready | 6/30/2021 (10:00 - 12:00) | 6/30/2021 (AM) | 06/30/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/30/2021
Unable to reach plumber on the job site. Waited 45 minutes for call or text.
|
||||
Plumbing Final Inspection | Partial Pass | 7/1/2021 (10:00 - 12:00) | 7/1/2021 (AM) | 07/01/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/01/2021
Air test on underground sanitary
|
||||
Plumbing Final Inspection | Partial Pass | 7/8/2021 (12:30 - 2:30) | 7/8/2021 (PM) | 07/08/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/08/2021
Air test on underground storm and flammable. Ok to backfill
|
||||
Plumbing Final Inspection | Partial Pass | 7/9/2021 (12:30 - 2:30) | 7/9/2021 (PM) | 07/09/2021 |
Plumbing Final Inspection | Partial Pass | 7/13/2021 (2:30 - 3:30) | 7/13/2021 (PM) | 07/13/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/13/2021
Visual on stacks in new area
Ok to cover
Future air test
|
||||
Plumbing Rough-in Inspection | Partial Pass | 11/15/2021 (12:30 - 2:30) | 11/15/2021 (PM) | 11/15/2021 |
Corrections:
Miscellaneous/Other
Comment Only
11/15/2021
AirTest on all waste and vent except for 2 units. Will see air on next inspection.
Therapy rooms not completed on 3rd floor. Will see air test in future.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 11/16/2021 (12:30 - 2:30) | 11/16/2021 (PM) | 11/16/2021 |
Corrections:
Miscellaneous/Other
Comment Only
11/16/2021
Air tests on roof drain leaders
|
||||
Plumbing Rough-in Inspection | Passed | 1/10/2022 (12:30 - 2:30) | 1/10/2022 (PM) | 01/10/2022 |
6- 5 lb air tests and visual on final phase of rough in. Still need visual on garage and mechanical room. | ||||
Plumbing Rough-in Inspection | Partial Pass | 2/9/2022 (8:00 - 10:00) | 2/9/2022 (AM) | 02/09/2022 |
Shower pan inspection on 3rd floor. Ok. | ||||
Plumbing Rough-in Inspection | Partial Pass | 3/2/2022 (12:30 - 2:30) | 3/2/2022 (PM) | 03/02/2022 |
Corrections:
Miscellaneous/Other
Comment Only
03/02/2022
Flood test on 2 shower drains
|
||||
Plumbing Final Inspection | Partial Pass | 3/10/2022 (12:30 - 2:30) | 3/10/2022 (PM) | 03/10/2022 |
Plumbing Final Inspection | Partial Pass | 3/25/2022 | 3/25/2022 (PM) | 03/25/2022 |
Corrections:
Miscellaneous/Other
Comment Only
03/25/2022
Manometer test on Wing two. Wing one has been manometer tested. Last inspection. I cannot find the history walked through 2 floors.
Common area on 1+2 will be manometered in future.
|
||||
Plumbing Final Inspection | Partial Pass | 4/1/2022 (8:00 - 10:00) | 4/1/2022 (AM) | 04/01/2022 |
Corrections:
Miscellaneous/Other
Comment Only
04/01/2022
1st floor walk through of rooms
Common areas to be finished
|
||||
Plumbing Final Inspection | Partial Pass | 5/10/2022 (10:00 - 12:00) | 5/10/2022 (AM) | 05/10/2022 |
Corrections:
Miscellaneous/Other
Comment Only
05/10/2022
Manometer tests on common areas
Temporary occupancy ok
3 sinks to install
Do inspection of garage
|
||||
Plumbing Final Inspection | Passed | 5/20/2022 (12:30 - 2:30) | 5/20/2022 (PM) | 05/20/2022 |