Permit Application Status

PRPL201912243


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL201912243
Plumbing
Expired
LIFESPACE COMMUNITIES INC
Other
Plumbing for new healthcare building, phase one and two.
10/14/2019
11/13/2019
11/16/2022

Locations

Permits

Permit Number: PRPL201912243

Plumbing
Expired
11/13/2019
11/16/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 12/2/2019 (12:30 - 2:30) 12/2/2019 (PM) 12/02/2019
Corrections:


Miscellaneous/Other
Comment Only
12/02/2019
Informational

Plumbing Rough-in Inspection Partial Pass 3/10/2020 (2:30 - 3:30) 3/10/2020 (PM) 03/10/2020
Plumbing Rough-in Inspection Partial Pass 3/12/2020 (12:30 - 2:30) 3/12/2020 (PM) 03/12/2020
Corrections:


Miscellaneous/Other
Comment Only
03/12/2020
Air test on sanitary and flammable under ground in the garage Air test on piping in cistern

Plumbing Rough-in Inspection Partial Pass 3/16/2020 (10:00 - 12:00) 3/16/2020 (AM) 03/16/2020
Plumbing Rough-in Inspection Partial Pass 3/27/2020 (12:30 - 2:30) 3/27/2020 (PM) 03/27/2020
Plumbing Rough-in Inspection Partial Pass 4/10/2020 (10:00 - 12:00) 4/10/2020 (AM) 04/10/2020
Plumbing Rough-in Inspection Partial Pass 4/15/2020 (8:00 - 10:00) 4/15/2020 (AM) 04/15/2020
Plumbing Rough-in Inspection Partial Pass 4/17/2020 (10:00 - 12:00) 4/17/2020 (AM) 04/17/2020
Corrections:


Miscellaneous/Other
Comment Only
04/17/2020
Airtest on most of the grease waste and sanitary for commercial kitchen. Approved. Future air test on remaining pipe.

Plumbing Rough-in Inspection Partial Pass 4/21/2020 (10:00 - 12:00) 4/21/2020 (AM) 04/21/2020
Plumbing Rough-in Inspection Partial Pass 4/23/2020 (10:00 - 12:00) 4/23/2020 (AM) 04/23/2020
Corrections:


Miscellaneous/Other
Comment Only
04/23/2020
Air test on under ground for commercial kitchen.

Plumbing Rough-in Inspection Passed 5/4/2020 (12:30 - 2:30) 5/4/2020 (PM) 05/04/2020
Plumbing Rough-in Inspection Partial Pass 5/13/2020 (Afternoon) 5/13/2020 (PM) 05/13/2020
Corrections:


Miscellaneous/Other
Comment Only
05/13/2020
Underground for trench drains in healthcare building

Plumbing Rough-in Inspection Partial Pass 5/21/2020 (2:30 - 3:30) 5/21/2020 (PM) 05/21/2020
Corrections:


Miscellaneous/Other
Comment Only
05/21/2020
Informational inspection. Approval to install horizontal wet vent including a tub, separate shower and emergency floor drain per 2015 MN Plumbing code chapter 2, definition of a “bathroom group.”

Plumbing Rough-in Inspection Partial Pass 7/15/2020 (10:00 - 12:00) 7/15/2020 (AM) 07/15/2020
Corrections:


Miscellaneous/Other
Comment Only
07/15/2020
Walk through apartments with Brent. Answer questions about sizing on vertical run of horizontal wet vent and question about transitioning from cast to plastic in the ceiling.

Plumbing Final Inspection Partial Pass 7/22/2020 (12:30 - 2:30) 7/22/2020 (PM) 07/22/2020
Corrections:


Miscellaneous/Other
Comment Only
07/22/2020
Informational Proposed layout for 5th floor horizontal wet venting approved.

Plumbing Rough-in Inspection Partial Pass 8/6/2020 (12:30 - 2:30) 8/6/2020 (PM) 08/06/2020
Corrections:


Miscellaneous/Other
Comment Only
08/06/2020
Air test in 1st wing. 2 failed. Will retest tomorrow.

Plumbing Rough-in Inspection Partial Pass 8/6/2020 (12:30 - 2:30) 8/6/2020 (PM) 08/06/2020
Plumbing Rough-in Inspection Partial Pass 8/7/2020 (12:30 - 2:30) 8/7/2020 (PM) 08/07/2020
Corrections:


Miscellaneous/Other
Comment Only
08/07/2020
Air tests on 2nd wing

Plumbing Rough-in Inspection Partial Pass 8/7/2020 (12:30 - 2:30) 8/7/2020 (PM) 08/07/2020
Plumbing Rough-in Inspection Partial Pass 8/18/2020 (12:30 - 2:30) 8/18/2020 (PM) 08/18/2020
Corrections:


Miscellaneous/Other
Comment Only
08/18/2020
Progress inspection

Plumbing Rough-in Inspection Partial Pass 8/20/2020 (12:30 - 2:30) 8/20/2020 (PM) 08/20/2020
Corrections:


Minimum Clearance
Comment Only
08/20/2020
Air test on under ground storm sewer in courtyard

Plumbing Rough-in Inspection Partial Pass 8/21/2020 (12:30 - 2:30) 8/21/2020 (PM) 08/21/2020
Corrections:


Miscellaneous/Other
Comment Only
08/21/2020
Under ground in courtyard approved 1 drain, 2 lines

Plumbing Rough-in Inspection Partial Pass 8/26/2020 (12:30 - 2:30) 8/27/2020 (PM) 08/27/2020
Plumbing Rough-in Inspection Partial Pass 9/14/2020 (12:30 - 2:30) 9/14/2020 (PM) 09/14/2020
Corrections:


Miscellaneous/Other
Comment Only
09/14/2020
3rd floor walk through and sign off Ok to cover

Plumbing Rough-in Inspection Pending 9/15/2020 09/15/2020
Plumbing Rough-in Inspection Partial Pass 9/15/2020 (AM) 09/15/2020
Plumbing Rough-in Inspection Partial Pass 9/16/2020 (AM) 09/16/2020
Plumbing Rough-in Inspection Not Ready 9/18/2020 (AM) 09/18/2020
Plumbing Rough-in Inspection Partial Pass 9/21/2020 (12:30 - 2:30) 9/21/2020 (PM) 09/21/2020
Plumbing Rough-in Inspection Partial Pass 10/8/2020 (10:00 - 12:00) 10/8/2020 (AM) 10/08/2020
Corrections:


Miscellaneous/Other
Comment Only
10/08/2020
5# air kitchen underground and venting. Water piping complete. Ok to cover

Plumbing Rough-in Inspection Partial Pass 10/23/2020 (Afternoon) 10/23/2020 (PM) 10/23/2020
Corrections:


Miscellaneous/Other
Comment Only
10/23/2020
Rough-in air test on stacked kitchens in assisted living.

Plumbing Rough-in Inspection Partial Pass 11/3/2020 (12:30 - 2:30) 11/3/2020 (PM) 11/03/2020
Corrections:


Miscellaneous/Other
Comment Only
11/03/2020
Air test on public bathrooms- first floor Air test on spa

Plumbing Final Inspection Partial Pass 12/4/2020 (12:30 - 2:30) 12/4/2020 (PM) 12/04/2020
Corrections:


Miscellaneous/Other
Comment Only
12/04/2020
Third floor walk through Signed cards some counter tops not installed plus one mop sink, laundry room

Plumbing Final Inspection Partial Pass 12/8/2020 (12:30 - 2:30) 12/8/2020 (PM) 12/08/2020
Corrections:


Miscellaneous/Other
Comment Only
12/08/2020
2nd floor walk through, most rooms completed. Waiting for laundry.

Plumbing Final Inspection Partial Pass 12/10/2020 (12:30 - 2:30) 12/10/2020 (PM) 12/10/2020
Plumbing Final Inspection Partial Pass 12/11/2020 (12:30 - 2:30) 12/11/2020 (PM) 12/11/2020
Corrections:


Miscellaneous/Other
Comment Only
12/11/2020
Manometer tests completed

Plumbing Final Inspection Partial Pass 12/14/2020 (12:30 - 2:30) 12/14/2020 (PM) 12/14/2020
Corrections:


Miscellaneous/Other
Comment Only
12/14/2020
1st floor walk through Partially completed

Plumbing Final Inspection Partial Pass 12/21/2020 (12:30 - 2:30) 12/21/2020 (PM) 12/21/2020
Plumbing Final Inspection Partial Pass 12/22/2020 (12:30 - 2:30) 12/22/2020 (PM) 12/22/2020
Corrections:


Miscellaneous/Other
Comment Only
12/22/2020
3rd floor and 2nd floor not completed. Working on public restrooms on 1st floor. Will be done with 1st floor public restrooms by the end of the day tomorrow and water turned on.

Plumbing Final Inspection Partial Pass 12/23/2020 (10:00 - 12:00) 12/24/2020 (AM) 12/27/2020
Plumbing Final Inspection Partial Pass 1/14/2021 (10:00 - 12:00) 1/14/2021 (AM) 01/14/2021
Corrections:


Miscellaneous/Other
Comment Only
01/14/2021
Final on 3 kitchens

Plumbing Final Inspection Partial Pass 1/28/2021 (12:30 - 2:30) 1/28/2021 (PM) 01/28/2021
Corrections:


Miscellaneous/Other
Comment Only
01/28/2021
Phase 1 final

Plumbing Final Inspection Not Ready 6/29/2021 (10:00 - 12:00) 6/29/2021 (AM) 06/29/2021
Plumbing Final Inspection Not Ready 6/30/2021 (10:00 - 12:00) 6/30/2021 (AM) 06/30/2021
Corrections:


Miscellaneous/Other
Comment Only
06/30/2021
Unable to reach plumber on the job site. Waited 45 minutes for call or text.

Plumbing Final Inspection Partial Pass 7/1/2021 (10:00 - 12:00) 7/1/2021 (AM) 07/01/2021
Corrections:


Miscellaneous/Other
Comment Only
07/01/2021
Air test on underground sanitary

Plumbing Final Inspection Partial Pass 7/8/2021 (12:30 - 2:30) 7/8/2021 (PM) 07/08/2021
Corrections:


Miscellaneous/Other
Comment Only
07/08/2021
Air test on underground storm and flammable. Ok to backfill

Plumbing Final Inspection Partial Pass 7/9/2021 (12:30 - 2:30) 7/9/2021 (PM) 07/09/2021
Plumbing Final Inspection Partial Pass 7/13/2021 (2:30 - 3:30) 7/13/2021 (PM) 07/13/2021
Corrections:


Miscellaneous/Other
Comment Only
07/13/2021
Visual on stacks in new area Ok to cover Future air test

Plumbing Rough-in Inspection Partial Pass 11/15/2021 (12:30 - 2:30) 11/15/2021 (PM) 11/15/2021
Corrections:


Miscellaneous/Other
Comment Only
11/15/2021
AirTest on all waste and vent except for 2 units. Will see air on next inspection. Therapy rooms not completed on 3rd floor. Will see air test in future.

Plumbing Rough-in Inspection Partial Pass 11/16/2021 (12:30 - 2:30) 11/16/2021 (PM) 11/16/2021
Corrections:


Miscellaneous/Other
Comment Only
11/16/2021
Air tests on roof drain leaders

Plumbing Rough-in Inspection Passed 1/10/2022 (12:30 - 2:30) 1/10/2022 (PM) 01/10/2022
6- 5 lb air tests and visual on final phase of rough in. Still need visual on garage and mechanical room.
Plumbing Rough-in Inspection Partial Pass 2/9/2022 (8:00 - 10:00) 2/9/2022 (AM) 02/09/2022
Shower pan inspection on 3rd floor. Ok.
Plumbing Rough-in Inspection Partial Pass 3/2/2022 (12:30 - 2:30) 3/2/2022 (PM) 03/02/2022
Corrections:


Miscellaneous/Other
Comment Only
03/02/2022
Flood test on 2 shower drains

Plumbing Final Inspection Partial Pass 3/10/2022 (12:30 - 2:30) 3/10/2022 (PM) 03/10/2022
Plumbing Final Inspection Partial Pass 3/25/2022 3/25/2022 (PM) 03/25/2022
Corrections:


Miscellaneous/Other
Comment Only
03/25/2022
Manometer test on Wing two. Wing one has been manometer tested. Last inspection. I cannot find the history walked through 2 floors. Common area on 1+2 will be manometered in future.

Plumbing Final Inspection Partial Pass 4/1/2022 (8:00 - 10:00) 4/1/2022 (AM) 04/01/2022
Corrections:


Miscellaneous/Other
Comment Only
04/01/2022
1st floor walk through of rooms Common areas to be finished

Plumbing Final Inspection Partial Pass 5/10/2022 (10:00 - 12:00) 5/10/2022 (AM) 05/10/2022
Corrections:


Miscellaneous/Other
Comment Only
05/10/2022
Manometer tests on common areas Temporary occupancy ok 3 sinks to install Do inspection of garage

Plumbing Final Inspection Passed 5/20/2022 (12:30 - 2:30) 5/20/2022 (PM) 05/20/2022