PRPL202000721
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Plumbing Rough-in Inspection | Partial Pass | 5/15/2020 (8:00 - 10:00) | 5/15/2020 (AM) | 05/15/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/15/2020
Pictures of 6” drain from elevator and connection to sump tank
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 5/21/2020 (10:00 - 12:00) | 5/21/2020 (AM) | 05/21/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/21/2020
Air test on flammable waste trap piping
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/2/2020 (10:00 - 12:00) | 6/2/2020 (AM) | 06/02/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/02/2020
5# flam and sanitary deep shop area
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/4/2020 (10:00 - 12:00) | 6/4/2020 (AM) | 06/04/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/04/2020
Manometer test on flammable waste tank.
ok to bury two offsets to floor drains
air test on Flammable waste under ground. ok to cover
Air test on sanitary sewer, ok to cover
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/17/2020 (10:00 - 12:00) | 6/17/2020 (AM) | 06/17/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/17/2020
Air test on flammable waste for trench drains. Ok to backfill
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/19/2020 (10:00 - 12:00) | 6/19/2020 (AM) | 06/19/2020 |
| Plumbing Rough-in Inspection | Partial Pass | 6/24/2020 (10:00 - 12:00) | 6/24/2020 (AM) | 06/24/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/24/2020
Air test on flammable waste
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 6/26/2020 (8:00 - 10:00) | 6/26/2020 (AM) | 06/26/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/26/2020
Air test on all flammable waste
|
||||
| Plumbing Rough-in Inspection | Not Ready | 7/7/2020 (8:00 - 10:00) | 7/7/2020 (AM) | 07/07/2020 |
| Plumbing Rough-in Inspection | Partial Pass | 7/8/2020 (8:00 - 10:00) | 7/8/2020 (AM) | 07/08/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/08/2020
Under ground 12” storm. South side air test
Sanitary under ground and flammable waste under ground air tested in shop area , car delivery and car wash, equipment room and trash room
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 7/13/2020 (10:00 - 12:00) | 7/13/2020 (AM) | 07/13/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/13/2020
Air test on underground sanitary for 1st floor bathrooms and mothers room sink.
Visual on 3 trench drains. Will see installation of interior trench drains.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 7/31/2020 (12:30 - 2:30) | 7/31/2020 (PM) | 07/31/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/31/2020
3# air 2nd floor primary and secondary
5# air all second floor waste and vent except men’s locker and mop sink
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 8/20/2020 (10:00 - 12:00) | 8/20/2020 (AM) | 08/20/2020 |
|
Corrections:
Minimum Clearance
Comment Only
08/20/2020
air Test on upper level plumbing
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 9/9/2020 (10:00 - 12:00) | 9/9/2020 (AM) | 09/09/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/09/2020
Additional storm drain on 1st level tested live.
2 Bathroom groups, drinking fountain, mop sink - all waste, vent and water air tested ok to cover.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 9/17/2020 (10:00 - 12:00) | 9/17/2020 (AM) | 09/17/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
09/17/2020
Air test on main roof drains and overflows
Air test on men’s/women’s upper floor bathrooms and shower rooms.
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 10/13/2020 (10:00 - 12:00) | 10/13/2020 (AM) | 10/13/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/13/2020
Air test on upper level and venting
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 10/29/2020 (10:00 - 12:00) | 10/29/2020 (AM) | 10/29/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
10/29/2020
Air test on Primary and secondary roof drains over entry way
|
||||
| Plumbing Final Inspection | Partial Pass | 1/22/2021 (10:00 - 12:00) | 1/22/2021 (AM) | 01/22/2021 |
|
Corrections:
Miscellaneous/Other
Comment Only
01/22/2021
Manometer tests.
Walk through.
Two sinks to install
Passed with conditions to install 2 sinks
RLA will re-inspect
|
||||
| Plumbing Final Inspection | Passed | 2/10/2021 (12:30 - 2:30) | 2/10/2021 (PM) | 02/10/2021 |