PRPL202003560
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Plumbing Rough-in Inspection | Partial Pass | 5/13/2020 (12:30 - 2:30) | 5/13/2020 (PM) | 05/13/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/13/2020
In wall rough in ok to cover
Future venting with air test and air test on underfloor piping
|
||||
| Plumbing Rough-in Inspection | Partial Pass | 5/26/2020 (12:30 - 2:30) | 5/26/2020 (PM) | 05/26/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
05/26/2020
Air test on North side did not hold. Retest Northside with west side . Visual of venting in the ceiling approved.
See under floor piping in ceiling below.
|
||||
| Plumbing Rough-in Inspection | Passed | 6/26/2020 (8:00 - 10:00) | 6/26/2020 (AM) | 06/26/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
06/26/2020
Air test on under floor piping ok
|
||||
| Plumbing Final Inspection | Passed w/ Conditions | 7/22/2020 (8:00 - 10:00) | 7/22/2020 (AM) | 07/22/2020 |
|
Corrections:
Miscellaneous/Other
Comment Only
07/22/2020
Final with conditions
Finish installing 2 hair washing sinks
Install back ordered hair traps
|
||||