Summary

PRPL202010202
Plumbing
Finaled
J & B HOLDINGS LLC
Alteration/Repair/Replace
Install drain waste and venting to code for *2 ADA toilets( B&B Supplying) *2 ADA lavs (B&B Supplying) Chrome Proflo lav faucets *Install 1 mop sink with faucet (B&B Supplying) *Install 3 handwashing sinks and faucets(Supplied by builder/Contractor) *1 two basin commercial sink and faucet (Supplied by Builder/Contractor) *1 three compartment sink and faucet (Supplied by Builder/Contractor) *Install 1 dishwasher machine (Supplied by Builder/Contractor) *Supply water line to installed chemical fixture which is installed by Builder/Contractor *Install 8 floor drains for freezers, bathrooms, Refrigerators, *Install tell tail drain on grease interceptor line *Future waste and venting for future bar *Supply water lines to water & soda dispenser & water line for coffee maker Commercial Remodel *Provide and Install 1000 gallon grease interceptor on outside of building per owner's request. **Note**Hole for grease interceptor to be dug out by others *Builder/Contractor to supply equipment to install grease interceptor. *Supply and install 100 gallon 199,000 BTU atmospheric water heater *B&B Plumbing will Supply Plans and Permits *Concrete Removal done by others-will have plumber meet to mark out.
09/08/2020
10/28/2020
01/12/2022
07/16/2021

Locations

Permits

Permit Number: PRPL202010202

Plumbing
Finaled
10/28/2020
01/12/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 11/9/2020 (8:00 - 10:00) 11/9/2020 (AM) 11/09/2020
Corrections:


Miscellaneous/Other
Comment Only
11/09/2020
Underground ok to cover

Plumbing Rough-in Inspection Partial Pass 12/10/2020 (8:00 - 10:00) 12/10/2020 (AM) 12/10/2020
Corrections:


Miscellaneous/Other
Comment Only
12/10/2020
Hand sink underground RI ok to cover-

Plumbing Rough-in Inspection Passed 12/16/2020 (12:30 - 2:30) 12/16/2020 (PM) 12/16/2020
Corrections:


Miscellaneous/Other
Comment Only
12/16/2020
5# air in wall and underground ok to cover-will see manometer at final

Plumbing Final Inspection Partial Pass 7/12/2021 (2:30 - 3:30) 7/12/2021 (PM) 07/12/2021
Corrections:


Miscellaneous/Other
Carried Forward
07/12/2021
1.Connect waters on 3 comp sink 2.Install ice maker 3.Increase waste on bar sink to 2”. 1-1/2” clean out on sink ok. 4.Pipe waste on 2 comp sink 5.Connect waste on dishwasher 6.Change clean out plugs to recessed type and put on clean out covers. 7. Install the 199,000 BTU power vent water heater 8.Install water meter 9.Call for re-inspection

Plumbing Final Inspection Passed w/ Conditions 7/16/2021 (10:00 - 12:00) 7/16/2021 (AM) 07/16/2021
Corrections:


Miscellaneous/Other
Resolved
07/16/2021
1.Connect waters on 3 comp sink 2.Install ice maker 3.Increase waste on bar sink to 2”. 1-1/2” clean out on sink ok. 4.Pipe waste on 2 comp sink 5.Connect waste on dishwasher 6.Change clean out plugs to recessed type and put on clean out covers. 7. Install the 199,000 BTU power vent water heater 8.Install water meter 9.Call for re-inspection

Miscellaneous/Other
Outstanding
07/16/2021
Manometer test ok Install faucet for mop sink when wall is in See that general caulks fixtures Ice maker needs parts Water heater just being fired up so check for hot water Install temperature balancing valve on lav in bathroom Call for reinspection