Permit Application Status

PRPL202011685


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL202011685
Plumbing
Finaled
MOAC MALL HOLDINGS LLC
Alteration/Repair/Replace
(2) restrooms and a few sinks
09/30/2020
10/20/2020
09/06/2021
03/10/2021

Locations

Permits

Permit Number: PRPL202011685

Plumbing
Finaled
10/20/2020
09/06/2021

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 10/30/2020 (10:00 - 12:00) 10/30/2020 (AM) 10/30/2020
Corrections:


Miscellaneous/Other
Comment Only
10/30/2020
Air test on bathroom and sink on upper level. Under Floor And in ceiling rough in for sinks to be completed.

Plumbing Rough-in Inspection Partial Pass 11/9/2020 (10:00 - 12:00) 11/9/2020 (AM) 11/09/2020
Plumbing Rough-in Inspection Partial Pass 11/17/2020 (8:00 - 10:00) 11/17/2020 (AM) 11/17/2020
Corrections:


Miscellaneous/Other
Comment Only
11/17/2020
Air test on 1st level under ground for floor drains.

Plumbing Rough-in Inspection Passed 11/23/2020 (10:00 - 12:00) 11/23/2020 (AM) 11/23/2020
Corrections:


Miscellaneous/Other
Comment Only
11/23/2020
Air test on all waste and vent. Completed in ceiling waste and vent for 2nd floor.

Plumbing Final Inspection Passed w/ Conditions 3/10/2021 (10:00 - 12:00) 3/10/2021 (AM) 03/10/2021
Corrections:


Miscellaneous/Other
Comment Only
03/10/2021
Bathroom counter tops not installed on upper level Manometer test