PRPL202103511
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Passed | 4/21/2021 (8:00 - 10:00) | 4/21/2021 (AM) | 04/21/2021 |
Corrections:
Minimum Clearance
Comment Only
04/21/2021
Air test on waste , vent and waters. Water valve in corridor. Replaced the 2” vent with 3” vent in corridor. 10 gallon water heater to be installed in ceiling. See piping below on final.
|
||||
Plumbing Final Inspection | Passed | 6/9/2021 (10:00 - 12:00) | 6/9/2021 (AM) | 06/09/2021 |