PRPL202106136
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 6/14/2021 (8:00 - 10:00) | 6/14/2021 (AM) | 06/14/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/14/2021
Consultation
Ok to dump mop sink and floor drain into grease waste. They will both contain grease from grill, hood wash down and floor mopping.
Cross reference environmental health plan to pin point direct connection sinks in bar area.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/17/2021 (10:00 - 12:00) | 6/17/2021 (AM) | 06/17/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/17/2021
Air test on grease waste and sanitary
Ok to pour
|
||||
Plumbing Rough-in Inspection | Passed | 7/13/2021 (8:00 - 10:00) | 7/13/2021 (AM) | 07/13/2021 |
Corrections:
Miscellaneous/Other
Comment Only
07/13/2021
Air test on waste and vent.
Air test on waters.
Air test on gas line.
|
||||
Plumbing Final Inspection | Partial Pass | 9/28/2021 (8:00 - 10:00) | 9/28/2021 (AM) | 09/28/2021 |
Corrections:
Miscellaneous/Other
Comment Only
09/28/2021
Temporary C.O.
Schedule re-inspection for manometer on coffee shop
Walk through with water on
Faucet on 4 comp sink.
Espresso machine installation
Blender rinser installation
Dishwasher installation
Cap off unused indirect waste line and leave for future
|
||||
Plumbing Final Inspection | Passed | 10/13/2021 (8:00 - 10:00) | 10/13/2021 (AM) | 10/13/2021 |
Corrections:
Miscellaneous/Other
Comment Only
10/13/2021
Corrections completed.
Manometer test on coffee counter
|