PRPL202106798
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Pending | |||
Plumbing Rough-in Inspection | Partial Pass | 6/17/2021 (12:30 - 2:30) | 6/17/2021 (PM) | 06/17/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/17/2021
Air test on under ground. Need complete air test when venting is completed.
No manometer test.
Didn’t sign card, sup was gone
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/29/2021 (12:30 - 2:30) | 6/29/2021 (PM) | 06/29/2021 |
Corrections:
Miscellaneous/Other
Comment Only
06/29/2021
Installation of trench drain and tank approved.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/7/2021 (12:30 - 2:30) | 7/7/2021 (PM) | 07/07/2021 |
Corrections:
Minimum Clearance
Comment Only
07/07/2021
Air test on back to back bathrooms.
Visual on tie into existing bathrooms.
Looked at where the water line is tying into the main.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/13/2021 (12:30 - 2:30) | 7/13/2021 (PM) | 07/13/2021 |
Plumbing Final Inspection | Partial Pass | 9/3/2021 (12:30 - 2:30) | 9/3/2021 (PM) | 09/03/2021 |
Corrections:
Miscellaneous/Other
Comment Only
09/03/2021
Temperature limiting device required on lavs and bathroom sinks.
Sinks to be changed out to Bradley when Bradley sinks arrive.
Partial final with conditions
Final on East bathroom
|
||||
Plumbing Final Inspection | Partial Pass | 9/9/2021 (12:30 - 2:30) | 9/9/2021 (PM) | 09/09/2021 |
Corrections:
Miscellaneous/Other
Comment Only
09/09/2021
Manometer test approved.
Visual on all bathroom toilets, south/west side. Waiting for sinks and lav’s to arrive.
See Bradley’s when installed on south/east side.
See trench drain for washing machines.
See gas line for units on roof.
|
||||
Plumbing Final Inspection | Passed | 10/15/2021 (2:30 - 3:30) | 10/15/2021 (PM) | 10/15/2021 |