Permit Application Status

PRPL202109757


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL202109757
Plumbing
Expired
BLOOMINGTON HOTEL VENTURE
Alteration/Repair/Replace
One sink
07/28/2021
07/29/2021
06/11/2022

Locations

Permits

Permit Number: PRPL202109757

Plumbing
Expired
07/29/2021
06/11/2022

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Plumbing Rough-in Inspection Pending
Plumbing Rough-in Inspection Partial Pass 8/4/2021 (10:00 - 12:00) 8/4/2021 (AM) 08/04/2021
Corrections:


Miscellaneous/Other
Comment Only
08/04/2021
Use approved transition couplings.

Plumbing Rough-in Inspection Partial Pass 12/13/2021 (8:00 - 10:00) 12/13/2021 (AM) 12/13/2021
Corrections:


Miscellaneous/Other
Comment Only
12/13/2021
Consultation on layout of remodel. Must use pipe approved to penetrate the wall, instead of braided hoses. Supply valves for kitchen sink approved to be under bathroom sink. Inspector must see installation of rough in for laundry room layout before approval is granted. Description of design appears to meet the code. Interior wall does not require fire caulking. No plumbing plans required for this job. Schedule inspections as far out as possible to avoid delays. And anything else Merle and I think of.