Permit Application Status

PRPL202201601


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL202201601
Plumbing
Expired
BLMGTN SCHOOL DIST #271
Alteration/Repair/Replace
Remodeling the inside of an existing school. Adding new piping and plumbing fixtures.
02/16/2022
03/04/2022
02/27/2023

Locations

Permits

Permit Number: PRPL202201601

Plumbing
Expired
03/04/2022
02/27/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 6/17/2022 (12:30 - 2:30) 6/17/2022 (PM) 06/17/2022
Corrections:


Miscellaneous/Other
Comment Only
06/17/2022
Air test on under ground for 2 bathrooms Ok to cover Piping plan for sink / bubbler locations ok 18 inch separation Signing off on print when inspected Demoing existing kitchen

Plumbing Final Inspection Partial Pass 6/23/2022 (12:30 - 2:30) 6/23/2022 (PM) 06/23/2022
Corrections:


Miscellaneous/Other
Comment Only
06/23/2022
Air test on u g for kitchen and a bathroom group. Inspected 7 classroom sinks. Manometer test on grease interceptor Ok to bury and pour.

Plumbing Rough-in Inspection Partial Pass 6/29/2022 (12:30 - 2:30) 6/29/2022 (PM) 06/29/2022
Corrections:


Miscellaneous/Other
Comment Only
06/29/2022
Visual and 5 lb. Air test on rough in’s for bathroom groups by mechanical room. 5 lb air test on underground for sinks on east side. Visual on sinks for classrooms.

Plumbing Rough-in Inspection Partial Pass 6/24/2022 (2:30 - 3:30) 6/24/2022 (PM) 07/05/2022
Plumbing Rough-in Inspection Partial Pass 7/5/2022 (8:00 - 10:00) 7/5/2022 (AM) 07/05/2022
Corrections:


Miscellaneous/Other
Comment Only
07/05/2022
Visual and 5 lb. air test on mechanical room underground and under ground for back to back sinks. Visual on rough in’s for sink relocations.

Plumbing Rough-in Inspection Partial Pass 7/7/2022 (12:30 - 2:30) 7/7/2022 (PM) 07/07/2022
Corrections:


Miscellaneous/Other
Comment Only
07/07/2022
Visual and 5 lb. Air test on underground in mechanical room with air handler.

Plumbing Rough-in Inspection Partial Pass 7/12/2022 (10:00 - 12:00) 7/12/2022 (AM) 07/12/2022
Corrections:


Miscellaneous/Other
Comment Only
07/12/2022
Visual and 5 lb. air test on above ground rough in for bathroom group, and air test on horizontal waste pipe serving roof top mechanical room. Venting not piped yet for this mech room.

Plumbing Rough-in Inspection Partial Pass 7/18/2022 (8:00 - 10:00) 7/18/2022 (AM) 07/18/2022
Corrections:


Miscellaneous/Other
Comment Only
07/18/2022
Visual and 5 lb.air test on all waste and vent piping for kitchen. Visual on all in wall water and gas pipe as well. Still need air test on gas piping when ready.

Plumbing Rough-in Inspection Passed 7/26/2022 (10:00 - 12:00) 7/26/2022 (AM) 07/26/2022
Corrections:


Miscellaneous/Other
Comment Only
07/26/2022
Rough in okay on 3 back to back classroom bathrooms. Rough in okay on staff bathroom. Discussed manometers for next inspection.

Plumbing Final Inspection Partial Pass 7/27/2022 (10:00 - 12:00) 7/27/2022 (AM) 07/27/2022
Corrections:


Miscellaneous/Other
Comment Only
07/27/2022
Manometer test on bathroom groups okay.

Plumbing Final Inspection Partial Pass 8/1/2022 (12:30 - 2:30) 8/1/2022 (PM) 08/01/2022
Corrections:


Miscellaneous/Other
Comment Only
08/01/2022
Manometer on bathrooms. Visual on vent in penthouse.

Plumbing Rough-in Inspection Partial Pass 8/8/2022 (12:30 - 2:30) 8/8/2022 (PM) 08/08/2022
Corrections:


Miscellaneous/Other
Comment Only
08/08/2022
Visual on partial gas. Will see a future air test on gas from mechanical room to the kitchen fixtures. Increase traps and waste on 2 compartment sink from 1-1/2” to 2” Visual rough in on classroom bathroom. Ok to run condensate for steamer in 1-1/2” pipe.

Plumbing Final Inspection Partial Pass 8/12/2022 (12:30 - 2:30) 8/12/2022 (PM) 08/12/2022
Corrections:


Miscellaneous/Other
Comment Only
08/12/2022
Final on 5 classroom bathrooms

Plumbing Final Inspection Partial Pass 8/16/2022 (12:30 - 2:30) 8/16/2022 (PM) 08/16/2022
Corrections:


Miscellaneous/Other
Comment Only
08/16/2022
Final visual inspection on all classroom sinks and drinking fountains. Contractor will finish caulking when area is clean. Still need to see air test on gas main and final visual inspection on commercial kitchen and mechanical room.

Plumbing Final Inspection Partial Pass 8/17/2022 (12:30 - 2:30) 8/17/2022 (PM) 08/17/2022
Corrections:


Miscellaneous/Other
Comment Only
08/17/2022
Air test okay on new gas line for water heaters and commercial kitchen.

Plumbing Final Inspection Partial Pass 8/25/2022 (12:30 - 2:30) 8/25/2022 (PM) 08/25/2022
Corrections:


Miscellaneous/Other
Comment Only
08/25/2022
Visual inspection of mechanical room and commercial kitchen. Dap classroom sinks and drinking fountains, finish penthouse venting, complete water filter in commercial kitchen, and laundry room faucet.

Plumbing Final Inspection Passed 8/31/2022 (12:30 - 2:30) 8/31/2022 (PM) 08/31/2022
Corrections:


Miscellaneous/Other
Comment Only
08/31/2022
Final visual inspection of remaining items from prior inspection are completed.

Plumbing Rough-in Inspection Passed 08/31/2022