Summary

PRPL202202241
Plumbing
Finaled
FINANCING PARTNERSHIP LP
Alteration/Repair/Replace
Complete plumbing remodel
03/07/2022
03/21/2022
07/19/2023
01/20/2023

Locations

Permits

Permit Number: PRPL202202241

Plumbing
Finaled
03/21/2022
07/19/2023

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Rough-in Inspection Partial Pass 4/6/2022 (8:00 - 10:00) 4/6/2022 (AM) 04/06/2022
Corrections:


Miscellaneous/Other
Comment Only
04/06/2022
Visual on under ground ok to backfill and test after. Contractor responsible for air test

Plumbing Rough-in Inspection Partial Pass 4/20/2022 (12:30 - 2:30) 4/20/2022 (PM) 04/20/2022
Added 3 comp sink, tell tale floor drain, and floor sink on underground. 5 lb. Air test good, okay to pour concrete.
Plumbing Rough-in Inspection Partial Pass 7/15/2022 (12:30 - 2:30) 7/15/2022 (PM) 07/15/2022
Corrections:


Miscellaneous/Other
Comment Only
07/15/2022
Visual and 5 lb. air test on all in wall piping, except one sink that did not have framing up for it.

Plumbing Rough-in Inspection Passed 8/9/2022 (10:00 - 12:00) 8/9/2022 (AM) 08/09/2022
Plumbing Rough-in Inspection Passed 8/17/2022 (12:30 - 2:30) 8/17/2022 (PM) 08/17/2022
Corrections:


Miscellaneous/Other
Comment Only
08/17/2022
Air test on entire system.

Plumbing Final Inspection Passed 1/20/2023 (10:00 - 12:00) 1/20/2023 (AM) 01/20/2023