PRPL202203313
There are no deposits or bonds for this permit application.
| Inspection | Outcome | Requested | Scheduled | Date Complete |
|---|---|---|---|---|
| Plumbing Final Inspection | Pending | |||
| Plumbing Rough-in Inspection | Pending | |||
|
Corrections:
Miscellaneous/Other
Outstanding
04/27/2022
Wye or wye-combo fittings need to be used for underground waste pipe. No tee fitting can used to convey waste horizontally, or vertical to horizontal. Replace 3x2 tee with 3x2 wye combo. Lav waste/toilet vent cannot turn horizontally until it is 6 inches above the spill line of the fixture. Reschedule inspection/consultation.
|
||||
| Plumbing Rough-in Inspection | Failed | 4/8/2022 (12:30 - 2:30) | 4/8/2022 (PM) | 04/08/2022 |
|
Corrections:
Miscellaneous/Other
Carried Forward
04/08/2022
Wye or wye-combo fittings need to be used for underground waste pipe. No tee fitting can used to covey waste horizontally. Reschedule inspection/consultation.
|
||||
| Plumbing Rough-in Inspection | Failed | 4/12/2022 (8:00 - 10:00) | 4/12/2022 (AM) | 04/12/2022 |
|
Corrections:
Miscellaneous/Other
Carried Forward
04/12/2022
Wye or wye-combo fittings need to be used for underground waste pipe. No tee fitting can used to convey waste horizontally, or vertical to horizontal. Replace 3x2 tee with 3x2 wye combo. Lav waste/toilet vent cannot turn horizontally until it is 6 inches above the spill line of the fixture. Reschedule inspection/consultation.
|
||||
| Plumbing Rough-in Inspection | Failed | 4/14/2022 (Afternoon) | 4/14/2022 (PM) | 04/27/2022 |
|
Corrections:
Miscellaneous/Other
Carried Forward
04/27/2022
Wye or wye-combo fittings need to be used for underground waste pipe. No tee fitting can used to convey waste horizontally, or vertical to horizontal. Replace 3x2 tee with 3x2 wye combo. Lav waste/toilet vent cannot turn horizontally until it is 6 inches above the spill line of the fixture. Reschedule inspection/consultation.
|
||||