PRPL202207419
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 6/27/2022 (10:00 - 12:00) | 6/27/2022 (AM) | 06/27/2022 |
Consoltation | ||||
Plumbing Rough-in Inspection | Partial Pass | 7/12/2022 (12:30 - 2:30) | 7/12/2022 (PM) | 07/12/2022 |
Corrections:
Miscellaneous/Other
Comment Only
07/12/2022
Visual and air test for new gas piping for range okay. Visual inspection of water line and ice maker box.
|
||||
Plumbing Rough-in Inspection | Passed | 11/30/2022 | ||
Water hammer protection for new refrigerator and new dish washer. PEX water supply lines and shut off valves for new kitchen remodel. Waste and vent for the new kitchen sink, is in the same location as the old kitchen sink. | ||||
Plumbing Final Inspection | Partial Pass | 12/11/2023 (2:30 - 3:30) | 12/11/2023 (PM) | 12/11/2023 |
Corrections:
Miscellaneous/Other
Comment Only
12/11/2023
Anti-tip bracket needs to be installed on gas range. Homeowner will submit picture when completed.
|
||||
Plumbing Final Inspection | Passed | 12/15/2023 | ||
Corrections:
Miscellaneous/Other
Comment Only
12/15/2023
Anti tip bracket now installed. Homeowner submitted picture on 12/14/23.
|