PRPL202207848
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Rough-in Inspection | Partial Pass | 3/28/2023 (10:00 - 12:00) | 3/28/2023 (AM) | 03/28/2023 |
Corrections:
Miscellaneous/Other
Comment Only
03/28/2023
Air tests on 2 sets of primary/overflow roof drains
|
||||
Plumbing Rough-in Inspection | Partial Pass | 4/11/2023 (12:30 - 2:30) | 4/11/2023 (PM) | 04/11/2023 |
Corrections:
Miscellaneous/Other
Comment Only
04/11/2023
Visual on air tests for 2 sets of roof drains, overflows and piping okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/16/2023 (8:00 - 10:00) | 8/16/2023 (AM) | 08/16/2023 |
Corrections:
Miscellaneous/Other
Comment Only
08/16/2023
Visual inspection and air test on remaining roof drains and associated piping okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 9/26/2023 (12:30 - 2:30) | 9/26/2023 (PM) | 09/26/2023 |
Corrections:
Miscellaneous/Other
Comment Only
09/26/2023
Air tests for all rough sanitary waste and vent piping okay. Contractor would like to close their permit.
|
||||
Plumbing Rough-in Inspection | Passed | 10/25/2023 (10:00 - 12:00) | 10/25/2023 (AM) | 10/25/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/25/2023
Contractor wants to close permit. Scope not complete, all connections made on sanitary and storm piping. Water service completed, and RPZ in service for irrigation. Projectshutdown. Contractor aware they would be required to apply for new permit.
|
||||
Plumbing Final Inspection | Closed | 10/25/2023 (10:00 - 12:00) | 10/25/2023 (AM) | 10/25/2023 |
Corrections:
Miscellaneous/Other
Comment Only
10/25/2023
Permit closed. More specific notes in other inspection reports.
Apollo 1” RPZ
Model:RPLF4A
Serial:655570
Tested and tagged
Serves irrigation, located in water service room
|