PRPL202303220
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Final Inspection | Pending | |||
Plumbing Rough-in Inspection | Not Ready | 5/10/2023 (10:00 - 12:00) | 5/10/2023 (AM) | 05/10/2023 |
Plumbing Rough-in Inspection | Partial Pass | 5/11/2023 (12:30 - 2:30) | 5/11/2023 (PM) | 05/11/2023 |
Plumbing Rough-in Inspection | Not Ready | 5/15/2023 (12:30 - 2:30) | 5/15/2023 (PM) | 05/15/2023 |
Plumbing Rough-in Inspection | Partial Pass | 5/16/2023 (12:30 - 2:30) | 5/16/2023 (PM) | 05/16/2023 |
Miscellaneous/Other
Comment Only
05/16/2023
Visual inspection and air test okay for portion of underground waste piping.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 5/17/2023 (12:30 - 2:30) | 5/17/2023 (PM) | 05/17/2023 |
Miscellaneous/Other
Comment Only
05/17/2023
Visual inspection and air test okay on portion of underground sanitary waste piping.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 5/18/2023 (12:30 - 2:30) | 5/18/2023 (PM) | 05/18/2023 |
Miscellaneous/Other
Comment Only
05/18/2023
Visual inspection and air test okay on portion of underground sanitary waste piping.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 5/30/2023 (12:30 - 2:30) | 5/30/2023 (PM) | 05/30/2023 |
Miscellaneous/Other
Comment Only
05/30/2023
Visual inspection and air test okay on a portion of underground waste piping on west side of building.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 5/31/2023 (12:30 - 2:30) | 5/31/2023 (PM) | 05/31/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/5/2023 (2:30 - 3:30) | 6/5/2023 (PM) | 06/05/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/6/2023 (12:30 - 2:30) | 6/6/2023 (PM) | 06/06/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/7/2023 (12:30 - 2:30) | 6/7/2023 (PM) | 06/07/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/8/2023 (12:30 - 2:30) | 6/8/2023 (PM) | 06/08/2023 |
Miscellaneous/Other
Comment Only
06/08/2023
Visual inspection and air test ok for a portion of underground sanitary and storm piping west side of building.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/9/2023 (12:30 - 2:30) | 6/9/2023 (PM) | 06/09/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/13/2023 (12:30 - 2:30) | 6/13/2023 (PM) | 06/13/2023 |
Plumbing Rough-in Inspection | Partial Pass | 6/14/2023 (12:30 - 2:30) | 6/14/2023 (PM) | 06/14/2023 |
Miscellaneous/Other
Comment Only
06/14/2023
Visual inspection and air test okayfor waste piping for trench drain on north side service and associated piping exiting flammable waste interceptor.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/20/2023 (12:30 - 2:30) | 6/20/2023 (PM) | 06/20/2023 |
Miscellaneous/Other
Comment Only
06/20/2023
Visual inspection and air test okay for the elevator pit drain and waste piping on the south end of the building.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/21/2023 (12:30 - 2:30) | 6/21/2023 (PM) | 06/21/2023 |
Miscellaneous/Other
Comment Only
06/21/2023
Water test on trench drain in southwest corner of service area okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/22/2023 (12:30 - 2:30) | 6/22/2023 (PM) | 06/22/2023 |
Miscellaneous/Other
Comment Only
06/22/2023
Water test on trench drain piping n northwest service area okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/26/2023 (12:30 - 2:30) | 6/26/2023 (PM) | 06/26/2023 |
Miscellaneous/Other
Comment Only
06/26/2023
Elevator pit drain piping to sump basket good and air test is good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/27/2023 (12:30 - 2:30) | 6/27/2023 (PM) | 06/27/2023 |
Miscellaneous/Other
Comment Only
06/27/2023
Manometer test on second big flammable waste tank in northwest part of shop area good.
Visual deep underground sanitary piping ok.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/28/2023 (12:30 - 2:30) | 6/28/2023 (PM) | 06/28/2023 |
Miscellaneous/Other
Comment Only
06/28/2023
Visual and air test ok on deep sanitary plumbing in building.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 6/29/2023 (12:30 - 2:30) | 6/29/2023 (PM) | 06/29/2023 |
Miscellaneous/Other
Comment Only
06/29/2023
Visual and air test good for underground plumbing serving bathrooms lounge sink in sales/showroom area.
Trench drain water test on southeast shop area good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/6/2023 (12:30 - 2:30) | 7/6/2023 (PM) | 07/06/2023 |
Miscellaneous/Other
Comment Only
07/06/2023
Visual and air test ok for underground plumbing in trash room.
Visual inspection for area drains in alignment rack area ok.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/7/2023 (12:30 - 2:30) | 7/7/2023 (PM) | 07/07/2023 |
Plumbing Rough-in Inspection | Partial Pass | 7/12/2023 (12:30 - 2:30) | 7/12/2023 (PM) | 07/12/2023 |
Miscellaneous/Other
Comment Only
07/12/2023
Visual and air tests for underground waste and vent ok.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/18/2023 (8:00 - 10:00) | 7/18/2023 (AM) | 07/18/2023 |
Miscellaneous/Other
Comment Only
07/18/2023
Visual and air test good on underground storm piping by north elevator.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 7/19/2023 (12:30 - 2:30) | 7/19/2023 (PM) | 07/19/2023 |
Plumbing Rough-in Inspection | Partial Pass | 7/20/2023 (8:00 - 10:00) | 7/20/2023 (AM) | 07/20/2023 |
Miscellaneous/Other
Comment Only
07/20/2023
Visual inspection for two trench drains in new car delivery garage water test good by north elevator.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 8/31/2023 (12:30 - 2:30) | 8/31/2023 (PM) | 08/31/2023 |
Miscellaneous/Other
Comment Only
08/31/2023
Visual inspection and air test okay for aboveground rough waste and vent piping for 2 sinks on east side of service shop. Water tests for trench drains on northwest side of building okay.
|
||||
Plumbing Final Inspection | Partial Pass | 10/4/2023 (8:00 - 10:00) | 10/4/2023 (AM) | 10/04/2023 |
Miscellaneous/Other
Comment Only
10/04/2023
Visual inspection and air tests okay root drains and piping on south side of building and sanitary waste and vent piping for sinks in middle of service shop.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 11/15/2023 (12:30 - 2:30) | 11/15/2023 (PM) | 11/15/2023 |
Plumbing Rough-in Inspection | Partial Pass | 11/16/2023 (10:00 - 12:00) | 11/16/2023 (AM) | 11/16/2023 |
Miscellaneous/Other
Comment Only
11/16/2023
Visual inspection and air tests okay for bathroom groups and overhead horizontal waste piping associated with those waste/vent stacks. Visual and air tests okay for Primary roof drains and associated piping over office/showroom space of project. Contractor needs to provide air tests on those overflows.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/7/2023 (12:30 - 2:30) | 12/7/2023 (PM) | 12/07/2023 |
Miscellaneous/Other
Comment Only
12/07/2023
Visual inspection and air test okay for bathroom groups on west side of service shop.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/14/2023 (10:00 - 12:00) | 12/14/2023 (AM) | 12/14/2023 |
Miscellaneous/Other
Comment Only
12/14/2023
Visual inspection and air test for overflow roof drains on northwest corner of building okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/19/2023 | ||
Miscellaneous/Other
Comment Only
12/19/2023
Air test are good to go
|
||||
Plumbing Rough-in Inspection | Partial Pass | 12/19/2023 (12:30 - 2:30) | 12/19/2023 (PM) | 12/19/2023 |
Plumbing Rough-in Inspection | Partial Pass | 12/20/2023 (12:30 - 2:30) | 12/20/2023 (PM) | 12/20/2023 |
Miscellaneous/Other
Comment Only
12/20/2023
Visual inspection and air tests for bathrooms on 2nd floor on the west side okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/9/2024 (12:30 - 2:30) | 1/9/2024 (PM) | 01/09/2024 |
Miscellaneous/Other
Comment Only
01/09/2024
Visual inspection and air tests on bathroom groups and associated piping on 3rd floor okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/11/2024 (10:00 - 12:00) | 1/11/2024 (AM) | 01/11/2024 |
Miscellaneous/Other
Comment Only
01/11/2024
Manometer test on bathrooms in service center okay. Air test on west side roof drain/overflow roof drain and associated piping okay.
|
||||
Plumbing Final Inspection | Partial Pass | 1/25/2024 (12:30 - 2:30) | 1/25/2024 (PM) | 01/25/2024 |
Plumbing Final Inspection | Partial Pass | 2/13/2024 (8:00 - 10:00) | 2/13/2024 (AM) | 02/13/2024 |
Miscellaneous/Other
Comment Only
02/13/2024
Air test on remaining roof drain piping by elevator lobby okay. Final visual inspection of service shop area okay, with the understanding the missing washer box is installed and pictures are submitted to me.
|
||||
Plumbing Final Inspection | Partial Pass | 02/13/2024 | ||
Miscellaneous/Other
Comment Only
02/13/2024
Wilkins 2" RPZ
Model: 975XL3
Serial: AMA03214
Tested and tagged
Located in water meter room in service shop, and feeds the non-potable water system
Wilkins 1 1/2" RPZ
Model: 975XL3
Serial: AMA09329
Tested and tagged
Located in service shop water room, and serves irrigation
Wilkins 2" RPZ
Model: 975XL3
Serial: AMA01838
Tested and tagged
Located in car wash mechanical room, and servers water line for car wash
Wilkins 1" RPZ
Model: 975XL3
Serial: ALA23397
Tested and tagged
Located in boiler room, and serves as the boiler feed
|
||||
Plumbing Final Inspection | Partial Pass | 4/9/2024 (12:30 - 2:30) | 4/9/2024 (PM) | 04/09/2024 |
Miscellaneous/Other
Comment Only
04/09/2024
Manometer tests okay.
|