Summary

PRPL202400678
Plumbing
Expired
VH-MINNEAPOLIS SOUTH INC
Alteration/Repair/Replace
Hotel bathroom remodel. 162 units Replace shower valves and lav faucets
01/18/2024
02/20/2024
10/05/2025

Locations

Permits

Permit Number: PRPL202400678

Plumbing
Expired
02/20/2024
10/05/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Plumbing Rough-in Inspection Partial Pass 3/5/2024 (8:00 - 10:00) 3/5/2024 (AM) 03/05/2024
Corrections:


Miscellaneous/Other
Comment Only
03/05/2024
Visual inspection of rough valves in rooms on 8th floor okay

Plumbing Final Inspection Partial Pass 4/9/2024 (10:00 - 12:00) 4/9/2024 (AM) 04/09/2024
Corrections:


Miscellaneous/Other
Comment Only
04/09/2024
Visual final for 8th floor okay except for 2 suites not yet completed

Plumbing Rough-in Inspection Partial Pass 4/30/2024 (8:00 - 10:00) 4/30/2024 (AM) 04/30/2024
Plumbing Final Inspection Partial Pass 6/14/2024 (12:30 - 2:30) 6/14/2024 (PM) 06/14/2024
Corrections:


Miscellaneous/Other
Comment Only
06/14/2024
Visual final for seventh floor complete.

Plumbing Rough-in Inspection Partial Pass 11/5/2024 (8:00 - 10:00) 11/5/2024 (AM) 11/05/2024
Plumbing Rough-in Inspection Partial Pass 11/8/2024 (8:00 - 10:00) 11/8/2024 (AM) 11/08/2024
Corrections:


Miscellaneous/Other
Comment Only
11/08/2024
5th floor Ri is good to go. Must cap off all sewer gas opening on 5th floor

Plumbing Final Inspection Partial Pass 12/23/2024 (12:30 - 2:30) 12/23/2024 (PM) 12/23/2024
Corrections:


Miscellaneous/Other
Comment Only
12/23/2024
No water on will check with 4th floor RI next Monday

Plumbing Final Inspection Partial Pass 1/10/2025 (10:00 - 12:00) 1/10/2025 (AM) 01/10/2025
Corrections:


Miscellaneous/Other
Comment Only
01/10/2025
needs toilet caps and seals on tub to floor also toilet valve covers

Plumbing Rough-in Inspection Partial Pass 1/10/2025 (10:00 - 12:00) 1/10/2025 (AM) 01/10/2025
Corrections:


Miscellaneous/Other
Comment Only
01/10/2025
ALL OPEN PLUMBING PIPES NEED TO BE SEALED OFF!!!

Plumbing Rough-in Inspection Partial Pass 1/28/2025 (12:30 - 2:30) 1/28/2025 (PM) 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
Ri are good down to 4th floor, floor 4 still needs RI

Plumbing Final Inspection Partial Pass 1/28/2025 (2:30 - 3:30) 1/28/2025 (PM) 01/28/2025
Corrections:


Miscellaneous/Other
Comment Only
01/28/2025
6th floor is good to go, but one unit 682 is still waiting for big tub that is back ordered will need inspection when ready

Miscellaneous/Other
Comment Only
01/28/2025
Floor 5 has a few things left to do 576,572,564 and 552

Plumbing Rough-in Inspection Partial Pass 2/6/2025 (8:00 - 10:00) 2/6/2025 (AM) 02/06/2025
Corrections:


Miscellaneous/Other
Comment Only
02/06/2025
Toilets are fixed on 5

Plumbing Final Inspection Partial Pass 3/20/2025 (12:30 - 2:30) 3/20/2025 (PM) 03/20/2025
Floor 4
Corrections:


Miscellaneous/Other
Comment Only
03/20/2025
458 leaking toilet, missing face plate on shower 456 need ADA toilet 455 needs toilet re-dap 459 leak on cap. 461 needs toilet re-dap

Plumbing Final Inspection Partial Pass 4/8/2025 (10:00 - 12:00) 4/8/2025 (AM) 04/08/2025
Corrections:


Miscellaneous/Other
Comment Only
04/08/2025
Still need to finish the corner suites on 8,6 and 4.