PRPL202405278
There are no deposits or bonds for this permit application.
Inspection | Outcome | Requested | Scheduled | Date Complete |
---|---|---|---|---|
Plumbing Final Inspection | Pending | |||
Plumbing Rough-in Inspection | Pending | 4/25/2025 (12:30 - 2:30) | 4/25/2025 (PM) | |
Plumbing Rough-in Inspection | Partial Pass | 9/12/2024 (10:00 - 12:00) | 9/12/2024 (AM) | 09/12/2024 |
Partial underground inspection | ||||
Corrections:
Miscellaneous/Other
Comment Only
09/12/2024
Partial underground inspection. Sections marked on print at job.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/10/2024 (12:30 - 2:30) | 10/10/2024 (PM) | 10/10/2024 |
Corrections:
Miscellaneous/Other
Comment Only
10/10/2024
Piping on elevator pit drains from pit to tanks looks good with 5 pound air test.
Partial run on sanitary on North East corner looks good with 5 pound air test.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/24/2024 (12:30 - 2:30) | 10/24/2024 (PM) | 10/24/2024 |
Underground inspection | ||||
Corrections:
Miscellaneous/Other
Comment Only
10/24/2024
Air test on underground storm okay.
Air test on underground bathroom group and rest of deep sanitary okay.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 10/30/2024 (10:00 - 12:00) | 10/30/2024 (AM) | 10/30/2024 |
Corrections:
Miscellaneous/Other
Comment Only
10/30/2024
Air tests on grease waste, 2 inch and 4 inch waist, laterals,
|
||||
Plumbing Rough-in Inspection | Partial Pass | 11/5/2024 (12:30 - 2:30) | 11/5/2024 (PM) | 11/05/2024 |
Corrections:
Miscellaneous/Other
Comment Only
11/05/2024
Plumbing underground complete.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/15/2025 (12:30 - 2:30) | 1/15/2025 (PM) | 01/15/2025 |
Corrections:
Miscellaneous/Other
Comment Only
01/15/2025
Second floor bathroom group southside 5 pound air test is good Rain leaders on southside piping looks good. Air test is good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/16/2025 (10:00 - 12:00) | 1/16/2025 (AM) | 01/16/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
01/16/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 1/23/2025 (12:30 - 2:30) | 1/23/2025 (PM) | 01/23/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
01/23/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 2/10/2025 (12:30 - 2:30) | 2/10/2025 (PM) | 02/10/2025 |
Corrections:
Miscellaneous/Other
Carried Forward
02/10/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.
|
||||
Miscellaneous/Other
Comment Only
02/10/2025
in wall waste vent on third floor for meeting rooms one and two look good with 5 pound test. Venting in wall on fourth floor looks good also.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/3/2025 (8:00 - 10:00) | 3/3/2025 (AM) | 03/03/2025 |
Corrections:
Miscellaneous/Other
Comment Only
03/03/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.
|
||||
Miscellaneous/Other
Comment Only
03/03/2025
Air test on second third and fourth floor bathrooms on West side is good.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 3/11/2025 (12:30 - 2:30) | 3/11/2025 (PM) | 03/11/2025 |
Corrections:
Miscellaneous/Other
Comment Only
03/11/2025
Roof drains, and roof drain overflows with air test look good on the west side.
|
||||
Plumbing Rough-in Inspection | Partial Pass | 4/4/2025 (10:00 - 12:00) | 4/4/2025 (AM) | 04/04/2025 |
Corrections:
Miscellaneous/Other
Comment Only
04/04/2025
Piping in bathroom groups on first floor looks good with air test.
Air test on gas lines for kitchen appliances back to Ansel valve looks good.
|