Permit Application Status

PRPL202405278


You will only be able to view fees or view conditions if you are a contact on the permit application.

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary

PRPL202405278
Plumbing
Permit(s) Issued
SICK PRODUCT & COMPETENCE CENTER AMERICAS LLC
Other
SICK Phase 2 - 4 story new office building plumbing scope.
04/25/2024
04/30/2024
10/01/2025

Locations

Permits

Permit Number: PRPL202405278

Plumbing
Issued
04/30/2024
10/01/2025

Deposits & Bonds

There are no deposits or bonds for this permit application.

Inspections

Inspection Outcome Requested Scheduled Date Complete
Plumbing Final Inspection Pending
Plumbing Rough-in Inspection Pending 4/25/2025 (12:30 - 2:30) 4/25/2025 (PM)
Plumbing Rough-in Inspection Partial Pass 9/12/2024 (10:00 - 12:00) 9/12/2024 (AM) 09/12/2024
Partial underground inspection
Corrections:


Miscellaneous/Other
Comment Only
09/12/2024
Partial underground inspection. Sections marked on print at job.

Plumbing Rough-in Inspection Partial Pass 10/10/2024 (12:30 - 2:30) 10/10/2024 (PM) 10/10/2024
Corrections:


Miscellaneous/Other
Comment Only
10/10/2024
Piping on elevator pit drains from pit to tanks looks good with 5 pound air test. Partial run on sanitary on North East corner looks good with 5 pound air test.

Plumbing Rough-in Inspection Partial Pass 10/24/2024 (12:30 - 2:30) 10/24/2024 (PM) 10/24/2024
Underground inspection
Corrections:


Miscellaneous/Other
Comment Only
10/24/2024
Air test on underground storm okay. Air test on underground bathroom group and rest of deep sanitary okay.

Plumbing Rough-in Inspection Partial Pass 10/30/2024 (10:00 - 12:00) 10/30/2024 (AM) 10/30/2024
Corrections:


Miscellaneous/Other
Comment Only
10/30/2024
Air tests on grease waste, 2 inch and 4 inch waist, laterals,

Plumbing Rough-in Inspection Partial Pass 11/5/2024 (12:30 - 2:30) 11/5/2024 (PM) 11/05/2024
Corrections:


Miscellaneous/Other
Comment Only
11/05/2024
Plumbing underground complete.

Plumbing Rough-in Inspection Partial Pass 1/15/2025 (12:30 - 2:30) 1/15/2025 (PM) 01/15/2025
Corrections:


Miscellaneous/Other
Comment Only
01/15/2025
Second floor bathroom group southside 5 pound air test is good Rain leaders on southside piping looks good. Air test is good.

Plumbing Rough-in Inspection Partial Pass 1/16/2025 (10:00 - 12:00) 1/16/2025 (AM) 01/16/2025
Corrections:


Miscellaneous/Other
Carried Forward
01/16/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.

Plumbing Rough-in Inspection Partial Pass 1/23/2025 (12:30 - 2:30) 1/23/2025 (PM) 01/23/2025
Corrections:


Miscellaneous/Other
Carried Forward
01/23/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.

Plumbing Rough-in Inspection Partial Pass 2/10/2025 (12:30 - 2:30) 2/10/2025 (PM) 02/10/2025
Corrections:


Miscellaneous/Other
Carried Forward
02/10/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.

Miscellaneous/Other
Comment Only
02/10/2025
in wall waste vent on third floor for meeting rooms one and two look good with 5 pound test. Venting in wall on fourth floor looks good also.

Plumbing Rough-in Inspection Partial Pass 3/3/2025 (8:00 - 10:00) 3/3/2025 (AM) 03/03/2025
Corrections:


Miscellaneous/Other
Comment Only
03/03/2025
Inspected in wall piping and mop sink piping on second floor south-side air test at 5 pounds was good.

Miscellaneous/Other
Comment Only
03/03/2025
Air test on second third and fourth floor bathrooms on West side is good.

Plumbing Rough-in Inspection Partial Pass 3/11/2025 (12:30 - 2:30) 3/11/2025 (PM) 03/11/2025
Corrections:


Miscellaneous/Other
Comment Only
03/11/2025
Roof drains, and roof drain overflows with air test look good on the west side.

Plumbing Rough-in Inspection Partial Pass 4/4/2025 (10:00 - 12:00) 4/4/2025 (AM) 04/04/2025
Corrections:


Miscellaneous/Other
Comment Only
04/04/2025
Piping in bathroom groups on first floor looks good with air test. Air test on gas lines for kitchen appliances back to Ansel valve looks good.